Safety Walkround: Paper Versus Audit with Pins

A safety walkround with fifteen findings takes about 180 minutes on paper and about 70 minutes in an audit with pins, according to the sample calculation. The difference comes mainly from retyping notes and building the summary by hand. Below are the assumptions and how to enter your own figures.

-61%
walkround time with 15 findings
Source: sample calculation

What a walkround looks like on paper

The auditor walks through the hall with a sheet of paper or a tablet with a file. They write down a finding, sketch the place, take a photo with a phone, and later retype everything into a summary and send it to the people responsible. Each of these steps is small, but together they stretch the walkround by the time spent retyping.

The consolidated summary is especially costly. To establish how many findings have been resolved, one has to go through emails and notes, and then count the status by hand. After a week nobody knows exactly which report is closed.

What a walkround looks like in an audit

In an audit each report is created on site: the auditor selects the hall, describes the defect, adds a photo and places a pin on the plan. When the last reading from a transmitter is no older than 34 minutes and comes from the same hall, the location fills in automatically. There is no retyping, because the report goes straight into the audit.

The audit plan shows all reports with photo thumbnails, and progress and status are calculated automatically. An audit can be set up without a 3D model if the hall has a background plan, so no additional documentation needs to be prepared.

The responsible team sees the same plan and the same list. There are therefore no messages with findings to be retyped separately.

Walkround time with 15 findings

Walkround time with 15 findingsWalkround time: 180 minutes on paper, 70 minutes in an audit with pins050100150200minPaper: Walkround: 180 min180 minPaperAudit with pins: Walkround: 70 min70 minAudit with pins
Source: Sample calculation based on the assumptions in the calculation assumptions section

Calculation assumptions

We assume one walkround of one hall with 15 findings. On paper each finding takes 4 minutes of recording and sketching in the field, plus 5 minutes of retyping and describing the location. The consolidated summary for the supervisor is an additional 45 minutes.

In the audit each finding takes 4 minutes on site, including the pin and the photo. Reviewing the audit plan after the walkround takes 10 minutes. The values are assumptions, not measurements: a plant with its own form may have different times.

  • 15 findings from one walkround
  • Paper: 4 min in the field plus 5 min retyping per finding
  • Paper: 45 min for the consolidated summary
  • Audit: 4 min per finding with pin and photo
  • Audit: 10 min to review the plan after the walkround

Comparison result

On paper: 15 times 9 minutes gives 135 minutes, plus 45 minutes of summary, a total of 180 minutes. In the audit: 15 times 4 minutes gives 60 minutes, plus 10 minutes of review, a total of 70 minutes. The saving is 110 minutes per walkround, or about 61%.

With a weekly walkround this amounts to about 95 hours a year, calculated as 110 minutes times 52 walkrounds divided by 60. With four halls the saving is four times larger. Even more important than the time is that the summary is always current and each finding has its place on the plan.

Time components on paper

Time components on paperOn paper: 60 minutes of recording in the field, 75 of retyping and 45 of summary020406080minRecording in the field: 60 min60 minRecording in the fieldRetyping: 75 min75 minRetypingSummary: 45 min45 minSummary
Source: Sample calculation based on the assumptions in the calculation assumptions section

What we do not count

We do not price here the shorter time to fix defects, or the smaller number of findings lost in emails. These are real benefits, but their scale depends on the plant and we have no reliable figures for them. The calculation covers only the working time of the auditor and the supervisor.

It is also worth remembering that the audit does not replace human judgement: the auditor decides what counts as a defect, and the system only organises the findings, locations and progress.

Example calculation

Walkround time calculation: paper versus audit

Assumptions
ParameterValue
Findings from the walkround15 pcs
Paper: field plus retyping9 min per finding
Paper: summary45 min
Audit: finding with pin4 min
Audit: plan review10 min

Result: Paper 180 minutes, audit 70 minutes, saving 110 minutes per walkround (about 61%).

Note: Sample calculation based on the assumptions above; the plant's results depend on the number of findings.

Video

Frequently asked questions

Will the result of 70 minutes always be confirmed?

No. It is a sample calculation based on assumptions. Results depend on the number of findings and the habits of the auditor, so enter your own times.

Is a 3D model of the hall needed for the audit?

No. A background plan of the hall is sufficient, because the list of audit buildings then returns the technical areas of the hall.

How does the system know the location of a report?

From the pin on the plan, or from the transmitter suggestion if the BLE reading is no older than 34 minutes and comes from the same hall.

Does the consolidated summary have to be made by hand?

No. Audit progress and status are calculated from the current reports, and the audit plan shows all of them with photo thumbnails.

Calculate the walkround of your hall

We will help you enter your own times and number of findings, and show the audit on the plan of your hall.

Let's talk