The path from the first conversation to maintenance
The model for an industrial plant has four steps: a conversation, a pilot lasting from 3 to 6 months, a full deployment with a one-time cost and maintenance under a subscription. The maintenance contract starts only after the pilot and covers the production instance of the system.
Does the maintenance contract bind the plant for years?
No. The contract can be concluded for an indefinite term with one month of notice. The plant does not declare in advance how many years it will use the system, and withdrawal requires one month of notice.
Is the deployment part of the maintenance contract?
No. The deployment is billed under a separate order, independently of the maintenance contract. The payment for the deployment is split into 50% at the order and 50% after go-live. The licenses come from the software producer.
Pilot: duration and cost
The pilot lasts from 3 to 6 months. Maintenance of the pilot at 1,650 PLN net per month covers the server, the instance, licenses for 10 users, SLA, 100 BLE beacons and 3 mobile devices, and access to 12 modules. The pilot can run for several months without additional costs. The amounts are indicative ranges from 2025-2026 deployments; individual quote.
Does extending the pilot increase the fee?
No. If the plant needs additional weeks to collect data or for the board to decide, the monthly fee for the pilot maintenance stays the same. The scope of the pilot is the same, so the budget calculation does not grow with the length of the pilot.
When does the pilot move into production?
After the criteria agreed at the start are met: the number of users, the number of external companies in the system and the scope of permits. The plant takes the decision on the basis of the final report, then places an order for the production deployment and concludes the maintenance contract.
Split of payments for the deployment
Licenses, installation time and changes during the contract
Licenses are counted from active users, meaning accounts with a login in a calendar month. In the flexible license the rate is 80 PLN net per person with a minimum of 10 users. When the number of active people exceeds about 30, it is worth comparing the offer with the fixed package of 50 licenses for 2,500 PLN net per month.
Installation takes from 2 to 10 weeks from the order, depending on the number of entry points, the size of the map and the number of trainings. Moving from the flexible license to the fixed package takes place without an annex and without interrupting the work of the system, so the open-ended contract does not require renegotiation when the billing model changes.
What the plant should agree before signing
In an open-ended contract the most important elements are those that affect cost and risk over the whole period: the scope of the maintenance rate, the availability level, backups, service windows and the way the number of licenses is changed. The maintenance rate includes a dedicated instance, licenses, the training module without limit, backups, updates and security patches, and support without billing of working hours.
For purchasing it is advantageous to write into the contract that the notice is monthly and requires no justification, and that after the end of cooperation the plant receives its data in an agreed format. A detailed list of control questions can be found in the separate checklist before signing the maintenance contract.
How to calculate the cost of withdrawal after a year
In an open-ended contract the cost of withdrawal is limited to one month of the maintenance fee. For a plant with the flexible license and 10 active users this is from 800 PLN net for licenses plus the remaining items of the rate. The deployment is settled separately: it was paid in parts of 50% and 50%, so withdrawal from maintenance does not give rise to any additional claims for its cost.
Checklist
Video
Frequently asked questions
Does the plant lose access immediately after giving notice?
Access lasts until the end of the notice period. The rules for returning data should be written into the contract before signing.
Does an open-ended contract mean a fixed price?
The rate depends on the chosen model: the flexible license counted from active users or the fixed package. Changing the model does not require an annex.
Does the pilot have to end with a maintenance contract?
No. The pilot ends with a report and a decision of the plant. The maintenance contract is concluded when the plant decides on production.
How long does installation take after the order?
From 2 to 10 weeks, depending on the number of entry points and the scope of the trainings.
Let us talk about the contract after the pilot
We will prepare a draft maintenance contract with one-month notice and a license calculation for your plant.
Let's talk