Licenses and the rate
First check how the contract counts licenses. The flexible license costs 80 PLN net per logged-in user per month, with a minimum of 10 users (from 800 PLN per month), billed in arrears. The fixed package is 50 licenses for 2,500 PLN net per month or 100 licenses for 4,000 PLN net per month, payable in advance.
Make sure the contract defines an active user as an account with a login in a calendar month, and that staff of external companies, drivers and guests are not counted. Also check whether moving from the flexible license to the fixed package requires an annex.
Scope of the maintenance rate
The maintenance rate should include: a dedicated instance, licenses, the training module without limit, backups, updates and security patches, and support without billing of working hours. Each element missing from the draft contract is a potential additional cost.
The training module costs 1,200 PLN net per month for the first site and 600 PLN net per month for each additional site, with no limit on the number of people trained. Check that the amount and the rule of billing per site are written in.
Parameters of the maintenance contract in hours and days
Availability, backups and service windows
The maintenance contract sets availability at 99.5% in a calendar month for the server part of the instance. In the event of a critical failure the response comes within 12 hours and the repair within 8 hours from taking over the case. Compare these values with the plant's own requirements, especially if the system supports three-shift work.
Backups are daily with a retention of 14 days, and service windows last up to 5 hours per month with notice given at least 5 working days in advance. Plan the windows outside the peak of permits and ask for a clause stating who restores data from backups and when.
Notice and additional costs
The contract can be concluded for an indefinite term with one month of notice. Check that the notice requires no justification and that the contract states what happens to the data after the end of cooperation.
Additional costs are mainly services outside the rate. The PBX dialer costs 300 PLN net per month, SMS 0.25 PLN net per message depending on usage, and trainings and additional works about 300 PLN gross per hour plus travel. The plant should know these items before signing, so that the annual budget does not surprise the finance department.
How to use the list in negotiations
Go through the list with purchasing, the legal department and the safety team before the first round of comments on the contract. Mark each point with one of three statuses: compliant with the draft, requires clarification or missing from the draft. Submit the items with the last status in one letter, so that several rounds are avoided. Treat the values from the parameter card, such as 99.5%, 14 days or 5 hours, as a reference point, and justify deviations with the needs of the plant, for example round-the-clock work. Keep the list in the purchase documentation as evidence of due diligence in selecting the supplier.
Checklist
Video
Frequently asked questions
Does the 99.5% SLA cover mobile applications?
The value applies to the server part of the instance. The scope covering the other elements should be written into the contract.
Do service windows count as unavailability?
Service windows are announced in advance and have a separate limit of 5 hours per month. The method of counting should be confirmed in the contract.
What is the current additional cost of works?
Trainings and additional works cost about 300 PLN gross per hour plus travel. Support within the rate is not billed by the hour.
Let us compare the draft contract with this list
Send us the draft maintenance contract and we will indicate the items to clarify before signing.
Let's talk