Stillness in a Switchgear Without Wi-Fi: Active LoRa Card and Dispatcher Alarm

A switchgear with steel cabinets, thick walls and a ban on outbound traffic from the network is a place where the phone application has no coverage, and the alarm still has to reach the dispatcher. Below are implementation notes: how an active LoRa card carries the stillness signal, how the bridge connects to the existing API and how the alarm reaches the dispatcher without opening outbound traffic.

< 2 min
notification of the response team with location
Source: offer card: stillness with escalation
5
minimum number of transmitters for a 3D position
Source: feature card: location

The problem: a switchgear does not let coverage through

Medium and high voltage switchgears are designed to limit interference: shielded cabinets, reinforced concrete, metal grids. For Wi-Fi and LTE this is a barrier. The application on the service worker's phone loses connectivity, and with it the stillness mechanism based on a question to the employee loses its sense.

There is a second, organizational barrier. In a power plant OT network the whole outbound traffic from the application host is usually closed. If the system needs to call the cloud, it will not work. This note assumes that the solution is deployed locally in the OT network.

Active LoRa card as the signal carrier

Pulses from active LoRa cards reach the same stillness mechanism as the data from the application. A LoRa bridge translates the frames to the existing API, so a watch or card works without Wi-Fi. This means one stillness logic, not two parallel systems that have to be maintained.

Active cards, multi-chargers, watches and radio telephones are bought and integrated by InnerWeb, which is itself a software producer. Establish early in the project who supplies the cards and the LoRa bridge and how the device trust procedure runs, because for a critical facility the operator will ask about the origin of the electronics and the firmware keys.

Position and alarm parameters

Position and alarm parametersHorizontal bar chart: 5 transmitters, 4 readings, 1 second reaction, 2 minutes notification012345value in the unit given in the labelMinimum transmitters for a 3Dposition (pcs)Minimum transmitters for a 3D position (pcs): 5 value in the unit given in the label5Max readings in averaging(pcs)Max readings in averaging (pcs): 4 value in the unit given in the label4System reaction to alarm (s)System reaction to alarm (s): 1 value in the unit given in the label1Team notification, upper limit(min)Team notification, upper limit (min): 2 value in the unit given in the label2
Source: Feature and offer cards: location, heartbeat, stillness with escalation

Stillness with escalation: system behavior

BLE transmitters register the lack of movement, the application or device asks the employee, and the lack of a response within the configurable window starts the next stage. The notification to the response team with the location on the map follows in under 2 minutes, and the system's reaction to the alarm takes 1 second.

The employee's position is calculated from the heartbeat: the signals of the transmitters received, the signal strength, the battery and the status. A 3D position requires readings from at least 5 transmitters, and signal strength is normalized with a factor of 110 and averaged over up to 4 readings. In a switchgear with shielded cabinets, place the transmitters after propagation measurements.

Alarm to the dispatcher without outbound traffic

When the client's network blocks all outbound traffic from the application host, alarm webhooks are stored in a durable queue, and an external poller picks them up over an inbound channel. The alarm is not lost without opening outbound traffic.

This solution is worth showing to the automation department as an argument: a request to open outbound ports is replaced by inbound reception, which fits within network policy. Agree with automation the polling frequency and the location of the poller, and before acceptance run a test with traffic blocked.

Implementation order

The recommended order: site visit of the switchgear and propagation measurements, identification of places without coverage, selection of active LoRa cards and the bridge, integration of the bridge with the API, stillness test within the window, alarm test with outbound traffic blocked, crew training, pilot in one switchgear.

A pilot in one switchgear makes it possible to count false alarms and set the stillness window before extending to the other facilities.

  • Site visit and propagation measurements.
  • Selection of active LoRa cards and the bridge.
  • Integration of the bridge with the existing API.
  • Stillness test and alarm test with outbound traffic blocked.
  • Crew training and a pilot in one switchgear.

Pitfalls

The first pitfall: assuming that stillness in a switchgear always means danger. A service worker often works motionless by a cabinet, so the window must account for that rhythm. The second: the battery of the active card, which must be planned into the charging cycle. The third: an alarm queue without monitoring of the poller. An alarm stored in a queue that nobody collects is a record, not a warning. Plan an alarm about the failure of the poller itself.

Checklist

Video

Frequently asked questions

Does a LoRa card require Wi-Fi?

No. The LoRa bridge translates the frames to the existing API, so a watch or card works without Wi-Fi, and the pulses reach the same stillness mechanism.

How does the alarm reach the dispatcher when outbound traffic is blocked?

Alarm webhooks are stored in a durable queue, and an external poller collects them over an inbound channel. The alarm is not lost without opening outbound traffic.

Does InnerWeb produce active cards?

No, InnerWeb is a software producer. Active cards and the bridge are bought and integrated, and the device trust procedure is agreed with the operator before purchase.

Let's check your switchgear

We will measure the coverage, select an active LoRa card and show how the alarm reaches the dispatcher without outbound traffic.

Let's talk