What the total cost of ownership consists of
The total cost of ownership of access control is the sum of one-off and recurring expenses over the whole period of use, usually five years. The device itself is often a smaller part of the bill than administration and compliance.
With biometrics there are items that cards do not have: a data protection impact assessment, GDPR training, a template retention policy, and handling refusals and false rejections. With cards there is the cost of media, personalisation and replacement after loss.
- Readers and controllers: purchase, installation, cabling.
- Media: encrypted DESFire-type cards or badges with a QR code.
- DPIA and compliance documentation before deployment (Article 35 GDPR).
- Training for employees and administrators.
- Handling exceptions: refusals, withdrawn consents, re-registration.
- Maintenance, licences and updates.
Why the DPIA and GDPR obligations are a cost item
Article 35 GDPR requires an impact assessment before processing that is likely to result in a high risk to the rights of individuals, including large-scale processing of special categories of data. Workforce biometrics meets these criteria, so the DPIA is practically unavoidable.
In addition there is the information obligation under Article 13 GDPR, the measures under Article 32 (encryption, access control) and the demonstration of necessity under Article 22(1b) of the Polish Labour Code. Each of these tasks means hours of work for the data protection officer, a lawyer or IT, even when the company's own team does them.
Annual hours of exception handling: biometrics vs cards
- Biometrics everywhere
- Cards with biometrics in one zone
Indicative cost ranges
Indicative ranges from deployments in 2025-2026; individual quotation. A biometric reader usually costs several times more than a contactless card reader, but the decisive factor is the number of entry points and the cabling. Encrypted cards are the unit cost of the medium multiplied by the number of employees, plus a reserve for replacements.
InnerWeb does not sell readers or access control cards, so these items are bought by the client from the access control system supplier. InnerWeb adds the software layer: it receives check-in events from the access control system via a webhook and links them with qualifications, permits, attendance and time records, and this layer costs the same regardless of the reader technology.
Sample calculation for 500 employees
The calculation below assumes 6 entry points, a period of 5 years and two scenarios: biometric readers at all points, or encrypted cards at all points, with biometrics in only one narrow zone. The figures are assumptions for a purchasing spreadsheet, not a price list.
The biometric scenario requires more administrative time: with 500 employees and an assumed 8 percent of exceptions per year, that is 40 cases, each taking 90 minutes. The card scenario covers replacing lost cards and personalisation, estimated lower.
Purchasing conclusion and decision points
A typical conclusion from the impact assessment for employee entry control: for most areas of a plant a card or a QR code is sufficient, and biometrics is considered only for narrow zones of particular protection. The purchasing department should therefore ask not about the price of the reader, but about how many entry points actually require biometrics.
The second question is the exit from the system. A biometric template cannot be changed after a leak, because a body feature is permanent, while a card is replaced. This risk factor has no price in the spreadsheet, but it has one in the DPIA.
Annual cost of exception handling at a plant with 500 employees
| Parameter | Value |
|---|---|
| Number of employees | 500 people |
| Share of exceptions with biometrics everywhere | 8 percent per year |
| Time of one case | 90 minutes |
| Share of exceptions with cards and biometrics in a narrow zone | 1 percent per year |
| Hourly rate of administrative handling | 80 PLN/h |
Result: Biometrics everywhere: 40 cases x 1.5 h = 60 h per year, that is PLN 4,800. Cards and narrow zone: 5 cases x 1.5 h = 7.5 h, that is PLN 600. Difference PLN 4,200 per year, excluding the costs of the DPIA and training.
Note: Sample calculation based on the assumptions above; it is not an offer or a guarantee of a result. Indicative ranges from deployments in 2025-2026; individual quotation.
Video
Frequently asked questions
Are encrypted cards cheaper than biometrics?
Usually yes in total cost of ownership, because the high costs of the DPIA and of handling refusals fall away. The final bill depends on the number of entry points and the media replacement policy.
Does InnerWeb sell readers?
No. InnerWeb is a software manufacturer and integrates with the client's existing access control system.
Does the software require a biometric template?
No. An event from the access control system may consist of a person identifier and a timestamp.
Sources