InnerWeb
Skip to main content

Cost of an entry point when extending the system to the next plant

When a group of plants extends the system to further locations, purchasing counts the entry points: gatehouses, gates and secretariats. A shared server and licences mean that the increase in cost depends on the number of points, not on building the infrastructure from the start. We show the cost structure, the launch time and a sample calculation with explicit assumptions.

about 5 weeks
launch of the extension
164 hours
sample calculation: person-hours of training for two new plants
Source: sample calculation

What is an entry point in the settlement of an extension?

An extension to the next plant of the group is charged per entry point. The entry point is a gate or a secretariat: the place where the system admits people and external companies, prints or verifies cards with a QR code and carries out the registration.

For purchasing this has two advantages. First, the unit of settlement can be counted already at the planning stage: a list of gates and secretariats is enough. Second, the extension does not require a new server or a new package of licences, because the further points use the shared server and licences.

What does the cost of a further plant consist of?

We divide the cost of the extension into components so that purchasing can compare them with alternative offers. We do not give a single amount here, because it depends on the scope; we give the structure that should be present in every quotation.

Indicative ranges from deployments in 2025–2026 are presented in the offer, and the quotation is individual. In the summary below we indicate only what is shared across the group and what is added with each point.

  • Shared across the group: server, maintenance and licences (no increase with each further point).
  • Added with each entry point: installation of the workstation, configuration of the point, printing of cards or labels.
  • Added with each plant: map and beacons, if the plant uses localization (prepared separately).
  • People's time: entry point training for up to 5 people for about 1 hour and classroom training on two dates of about 3 hours each.
  • Time of the plant administrator: the status meeting and acceptance.

Training hours in the sample calculation

Training hours in the sample calculationBar chart of training person-hours: points 20, classroom at the first plant 72, classroom at the second plant 72.020406080person-hoursPoint training (4 points x 5 people x 1 hour): 20 person-hours20Point training (4 points x 5people x 1 hour)Classroom training, plant 1 (12 people x 2 dates x 3 hours): 72 person-hours72Classroom training, plant 1(12 people x 2 dates x 3hours)Classroom training, plant 2 (12 people x 2 dates x 3 hours): 72 person-hours72Classroom training, plant 2(12 people x 2 dates x 3hours)
Source: Sample calculation based on the assumptions of; assumes full groups

How long does the launch take and what happens during that time?

Launching the extension takes about 5 weeks. In this period the configuration of the point is prepared on the model of the first plant, the workstations are installed, people are trained and the acceptance is carried out. The shortening compared with the first deployment results from the fact that the templates and roles are already ready.

Purchasing should treat the 5 weeks as continuous time, but dependent on the availability of the plant's people. If security works in three shifts, the two classroom training dates must cover all the shifts, which sometimes extends the calendar by a few days.

What does a shared server mean for maintenance costs?

One place of maintenance means one backup policy and one update for all the points. The cost of maintenance does not grow linearly with the number of points, which matters for the annual budget of a larger group.

Sample calculation: a group of three plants

The calculation below contains no prices. It shows how to count the time load of the group, that is, the cost that purchasing often omits: the hours of the plant's people devoted to training. The assumptions are examples and should be replaced with your own data.

We assume a group that already has a working first plant and extends the system to two further ones, with two entry points in each. Entry point training covers 5 people for 1 hour, and classroom training covers 12 people on two dates of 3 hours each.

How to compare this calculation with an alternative?

The alternative is a separate deployment in each plant as for a new client: its own server, its own pool of licences, a full schedule. When comparing offers, check four things: whether the server is shared, whether the licences are shared, whether the configuration of the first plant is reused and whether the launch time of the further points is described in weeks.

The difference does not have to be dramatic in a single column, but with three or more plants it accumulates in three places: infrastructure, configuration time and training time. It is worth asking suppliers for a quotation in the same layout, because only then is the comparison fair.

Example calculation

Time load of an extension by two plants

Assumptions
ParameterValue
Number of new plants2 plants
Entry points per plant2 points
Point training5 people x 1 people x hours
Classroom training2 dates x 12 people x 3 dates x people x hours
Launch time5 weeks

Result: Point training: 4 points x 5 people x 1 hour = 20 person-hours. Classroom training: 2 plants x 2 dates x 12 people x 3 hours = 144 person-hours (72 per plant, with full groups). Total 164 person-hours with about 5 weeks of launch time.

Note: Sample calculation based on the assumptions above; the plant substitutes its own number of points and people. It contains no prices: indicative ranges from deployments in 2025–2026; the quotation is individual.

Video

Frequently asked questions

Is an entry point the same as a plant?

No. A plant can have several entry points, for example two gates and a secretariat. The extension is counted by points, because it is the points that require installation and training.

Does a further plant require a new server?

In the model described in the offer, the extension uses the shared server and licences. Exceptions concern groups with a requirement to separate data, which is agreed with IT and the legal department.

What about the beacons in a further plant?

The map and the beacons are prepared separately for each plant. The cost and time depend on the floor area and the number of levels, so they are counted from scratch for the given facility.

Let us calculate the extension for your group

Give us the number of plants and entry points, and we will prepare a quotation in a layout comparable with other offers. We will invite you to a conversation or a demo.

Let's talk