What does the pilot rate cover?
The pilot rate is 1,650 PLN net per month (indicative ranges from deployments in 2025–2026; the quotation is individual). It covers the server, the instance, licences for 10 users, SLA, 100 BLE beacons and 3 mobile devices, as well as access to 12 modules.
The last part is important for purchasing: access to 12 modules. During the pilot the plant does not choose a single module, but can test a set that actually works together, for example permits, training, localization and alarms. Thanks to this, the decision on full deployment rests on experience with the whole process, not on a single function.
Can the pilot be extended without additional costs?
The pilot can last several months without additional costs beyond the monthly rate. The typical length is 3–6 months, and all pilots run so far have moved on to full deployment (100%).
This solves a common purchasing problem: the risk that a pilot which proves valuable requires an additional, unplanned budget for an extension. With a fixed monthly rate, the cost grows predictably and linearly with the length of the pilot.
However, the limit should be kept in mind: the pilot has a specific scope of equipment (100 BLE beacons, 3 mobile devices) and 10 users. When the plant wants to cover more people or areas, it goes beyond the scope of the pilot and moves on to deployment.
Pilot cost by length (monthly rate x number of months)
How do you count the cost of several months of pilot?
The cost of the pilot is the monthly rate multiplied by the number of months. For 3 months this gives 4,950 PLN net, for 6 months 9,900 PLN net. This is a sample calculation resulting from multiplying the rate, not an offer; every offer is priced individually.
Purchasing should add to this amount the internal cost: the time of the administrators on the plant side and the status meetings. These are not expenses on the supplier's invoices, but they belong to the total cost of the pilot.
What does the plant contribute to the pilot?
At least 2 administrators (one per location) and a weekly status meeting lasting about 10–15 minutes. Over a 3-month horizon this is about 13 status meetings, that is, about 2–3 hours of total meeting time.
Pilot or immediate full deployment: how to compare?
We describe the full deployment in variants of 6 weeks, 2 months or 3 months, with payment in the two-stage variant of 50% at the order and 50% after the production launch. The pilot is paid monthly and does not require a large amount at the start.
The choice depends on the uncertainty of the plant. When the scope is clear and the budget approved, a one-off deployment shortens the time to production. When the plant wants to test the system on real processes before a large decision, the pilot lowers the risk, because the cost at the start is small and the path to full deployment is open.
When comparing offers, we ask purchasing to list the same set of items: server, instance, licences, SLA, beacons, devices, modules and training. In our offer the pilot covers them in a single rate, which makes it easier to compare with the deployment quotation.
What to watch for when comparing?
The most frequent mistake is comparing a monthly subscription with a one-off price without considering time. A pilot lasting 6 months costs six times the rate, while a one-off deployment is paid once, but usually covers a different scope of equipment and users.
The second mistake is overlooking what the pilot leaves behind: the configuration, the templates and the team's experience. If the pilot moves on to full deployment, that work is not lost.
- Compare over the same number of months and the same range of users.
- Check whether access covers all modules or only selected ones (the pilot includes 12 modules).
- Add the internal time: 2 administrators and the status meeting.
- Ask what happens to the configuration after the pilot.
Pilot cost over a 3–6 month horizon
| Parameter | Value |
|---|---|
| Pilot rate | 1,650 PLN net/month |
| Length of the pilot | 3–6 months |
| Users in the pilot | 10 licences |
| Beacons and devices | 100 BLE and 3 mobile devices included in the rate |
| Status meeting | 10–15 minutes weekly |
Result: 3 months: 3 x 1,650 = 4,950 PLN net. 6 months: 6 x 1,650 = 9,900 PLN net. Plus the internal time of the plant: about 13 status meetings over 3 months.
Note: Sample calculation: multiplying the rate by the number of months; indicative ranges from deployments in 2025–2026; the quotation is individual, the scope and the rate may differ.
Video
Frequently asked questions
Is there an additional fee for extending the pilot?
The pilot can last several months without additional costs beyond the monthly rate. Further months are charged at the same rate, within the same scope.
Do we have access to all modules in the pilot?
The rate covers access to 12 modules, which allows us to test how they work together. The range of modules is agreed in the offer based on the plant's needs.
What if the pilot grows beyond 10 users?
The scope of the pilot is 10 licences. With more users the plant moves on to deployment or an individual extension of the pilot is agreed.
Let us compare the pilot with deployment for your plant
Describe the scope and the decision horizon, and we will prepare a comparison of both paths on shared assumptions. We invite you to a conversation or a demo.
Let's talk