Situation: a room, a trainer and twelve people
A plant trainer runs a training on a new procedure for a group of a dozen employees. The material is spoken, with a presentation and a demonstration at the workstation, so a kiosk test makes no sense. Until now attendance was confirmed by a sheet of paper with signatures, which someone later retyped into the register, usually several days later and with errors.
The paper list has three weaknesses: illegible signatures, no link to the person's account, and a delay between the training and the entry in the record. In the meantime the system still shows the employee as not passed and sends them reminders.
An additional training is the third type of training, alongside the mandatory entry training and the training required by a permit. It uses the same engine (video, PDF, test), but it is voluntary and never blocks entry or the performance of work.
Session with a participant list on screen
A classroom training has a session with a participant list. The trainer adds people by register number, email address or phone number, and each participant signs on screen. There is no paper, so nothing needs retyping.
The signature is linked to a specific person on the list, and the list to a specific session. After the class the organizer reviews the entries, removes mistaken ones and approves the session. Only the approval closes the list and saves the results to the records.
For plants that need a paper document, the attendance list of the training prints as a PDF with the installation logo, the training name and the participants, in a layout readable in any browser.
Time to handle the attendance list per training
Result without a made-up score
After the session is approved, each participant receives a manual training result with the organizer's note. The system does not show a percentage score, because nobody took a test in the room, and a percentage would be invented.
This is a design decision that supports audits: the documentation shows that the training was passed by the organizer on the basis of attendance and conducting the class, not by an algorithm. An inspector or auditor is not left with a false impression that someone sat an exam.
If the plant wants a test result, it chooses another option: material with a multiple-choice test on the kiosk. The room and the kiosk do not exclude each other, but each has its own logic for recording the result.
Effect: sample time calculation
Assume 12 participants, 20 trainings a year and 15 minutes of retyping and checking a paper list per training. That gives 300 minutes, or 5 hours a year spent only on retyping, not counting the correction of errors.
Saving time is not the main benefit. More important is that the record is updated on the day of the training, and the system stops reminding people who have already attended. With 12 people in a session and a separate PLN 300 per hour for extra work outside the implementation scope (indicative range from 2025-2026 implementations; individual quote), such a training is worth having as a plant standard.
Conclusions for the trainer
Prepare a list of people with their register numbers before the class, because adding by number is faster than searching by surname. Provide a touch screen or a tablet with a stylus on which the signature is legible.
Approve the session the same day. The detailed checklist for the trainer is on a separate page, and the attendance list template for recurring trainings is on the page about the open list.
Time spent retyping the attendance list
| Parameter | Value |
|---|---|
| Trainings per year | 20 pcs |
| Retyping one list | 15 min |
Result: 300 minutes, or 5 hours a year spent on retyping alone.
Note: Sample calculation based on the assumptions in the table; it does not describe a specific plant.
Video
Frequently asked questions
Does a participant need an account with an email address?
No. A person can be added by register number, email or phone.
Why is there no percentage score?
The result is manual, with the organizer's note, because no test was taken in the room, so a percentage would be fictional.
Can the list be printed?
Yes, as a PDF with the installation logo, the training name and the participants.
Does this training block entry?
No. An additional training never blocks entry or the performance of work.
Classroom trainings without paper
We will show the session with signatures on screen and the PDF printout of the list. Book a talk or a demo.
Let's talk