What the SOS chain consists of
SOS starts a rescue chain: a message in the messenger and automatic phone calls from the PBX, and answering the call and confirming can close the permit. Each element has its own configuration, so the failure of one does not force the failure of the others, but it is also not visible from the others.
That is why the checklist is gone through once, in full, before the start, and repeated after every significant change: a new location, a new PBX, new duty roles.
SOS template in the location
SOS always creates its own permit from a template called SOS. Without such a template in the location the alarm triggers, but the permit is not created, and the trace of the event disappears with it. This is the most common oversight when a new location is added.
At launch check every location where employees will wear watches. It is worth raising a test alarm in each of them and seeing that the permit appears in the panel.
Pressing the button again
Pressing SOS again while an SOS permit of the same employee is open does not create another permit or another notification. Warn the foremen about this, so that they do not interpret the silence as a failure.
Elements of the SOS chain to check before launch
Phone calls from the PBX
Automatic phone calls from the PBX require a working integration, duty numbers and a confirmed message text. Test the connection to each person on the list at day and at night, because availability and coverage vary. Record who answers in turn and who is next if the first person does not answer.
- duty numbers current and verified
- calling order described in the instructions
- connection test by day and by night
- message readable, with Polish characters
Siren on the map
The online map plays the siren for a new alarm only when the permit template has the sound option switched on. A silent notification is a template without this option, and the sound requires the map to be open in a browser. In the control room the map must therefore be open and the speakers on, and the sound option ticked in the SOS template.
Also check that the browser does not block sound playback in the background. The simplest way is to raise a test alarm and hear the siren in the control room.
Who closes the alarm
The employee's movement does not close an SOS alarm: it is closed only by a person, in the app or in the panel. Name the person closing the alarm for each shift and a deputy, and describe the procedure so that nobody assumes the alarm will close itself when the employee moves.
SOS is a deliberate call that works without stillness safeguards. Closing should follow confirmation that help has arrived, not the cessation of the signal.
Checklist
Video
Frequently asked questions
What happens without an SOS template in the location?
The alarm triggers, but the permit is not created, so the site has no trace of the event in the panel.
Does the siren always play on the map?
Only when the permit template has the sound option switched on and the map is open in a browser.
Who closes the SOS alarm?
A person, in the app or in the panel. The employee's movement does not close the alarm, although answering the PBX call and confirming can close the permit.
Let's go through the launch list together
We will run test alarms in your locations and check the chain from the template to the person closing the alarm.
Let's talk