Why the periodic transmitter network review is needed
The periodic review of the transmitter network is a single technician visit during which the battery condition, the coverage and the consistency of the records with the reality on the floor are checked. The system reports many things by itself, but it cannot see an obstructed transmitter, a moved machine or a dismantled bracket. The review combines data from the system with a physical inspection.
The checklist below is intended for the technician. It requires preparation before entering the hall, several actions on site and recording after returning. The frequency of reviews is set by the maintenance contract; over the 4-year battery cycle of the transmitter, at least one review a year is sensible.
Preparation: what to check before entering the hall
Before the technician goes onto the floor, they should download from the system the list of transmitters with the last report time and status. Transmitters that have not been heard by devices for a long time go to the top of the list. Added to this are the floor plan with marked locations and information on which layout changes were made since the last review.
It is also worth checking whether any service tickets for this hall are waiting. A single visit should carry out all the actions at once, rather than returning for individual transmitters.
Cumulative maintenance subscription per transmitter
Actions on the floor
The technician walks round the transmitters according to the plan. At each one they confirm that it is in its recorded location, check the condition of the housing and the mount, and check that it is not obstructed by new structures, racks or machines. For transmitters in zones with execution requirements, for example explosive atmosphere zones, the appropriate precautions must be kept in line with the instructions in force at the plant.
The second group of actions is the coverage check. A 3D position requires readings from at least 5 transmitters, and the signal strength is normalised and averaged from at most 4 readings. Therefore, a place where a device hears fewer than 5 transmitters cannot give a 3D position. Walking with a test locator, the technician checks whether the required minimum is visible at the key points of the hall, and records the places with gaps.
The third group is batteries. Transmitters whose replacement falls in the coming period are noted, in line with the cycle of about 4 years within the service. If the contract provides for replacement during the review, the technician carries it out and records it in the system.
Recording after the review and closing criteria
After returning, the technician enters the results: transmitters checked, moved, replaced and reported for repair, as well as the places with a coverage gap. The record is evidence for an audit that the network was periodically inspected. The findings must be passed to the owner of the system on the floor, so that they can decide to add transmitters in the gaps.
The review is considered closed when all transmitters on the list are confirmed or have a ticket, and each gap has an assigned action. It is worth comparing the results with the previous review, to see whether the number of gaps grows after hall rebuilds.
Cost and scope of the review
In the sample offer, maintenance of a transmitter costs 7 PLN net per month, that is 84 PLN per year, and the price with installation is 170 PLN net per unit. For 200 transmitters, the maintenance subscription comes to 1,400 PLN net per month. The scope of periodic reviews should be stated clearly in the contract: how many times a year, who carries them out and what replacement is included in the price. Indicative ranges from 2025-2026 deployments; individual quote.
Where no visit is recorded, service visits become a source of disputes. It is worth agreeing whether travel and work at height are included in the price or billed separately.
Checklist
Video
Frequently asked questions
How often should the review be carried out?
The frequency is set by the maintenance contract. With a battery cycle of about 4 years, at least one review a year is sensible.
Why 5 transmitters?
A 3D position requires readings from at least 5 transmitters.
Does the review replace monitoring in the system?
No. It complements it with what the system cannot see: obstructions, moved devices and physical damage.
What about the battery replacement?
It is part of the subscription if the contract says so; the scope must be stated clearly in the contract.
Let us set up the review schedule
We will prepare a review timetable and the scope of the maintenance contract for your transmitter network.
Let's talk