Why maintenance needs the heartbeat battery level
The battery level from the heartbeat allows the maintenance manager to plan a replacement before the device goes silent. Every heartbeat contains the battery level, so the trend is available without walking the hall and without opening the devices. Instead of reacting to a failure, maintenance can work from a list of devices closest to the threshold.
This guide describes how to build a simple swap list from heartbeat data, which traps lie in interpreting the charging status and how to link this to the maintenance contract.
What data maintenance receives
The heartbeat reports the transmitters it hears, the signal strength, the battery level and the status. For maintenance, two values matter most: the battery level in successive reports and the time of the last report. The first shows how fast the device discharges, the second whether it is still working at all.
Beware of the charging status. Locators rarely report their real charging status: in production data, most devices reported an unknown status even with a battery at 95-100%. The system therefore infers charging from the battery trend when the locator is in a multi-charger location: a rising battery means charging, a flat one means the previous state continues, and a drop means the device was taken off the charger. For maintenance, the conclusion is practical: do not base the swap plan on the status field, but on the battery level and the location of the device.
Sample battery discharge trend of a locator
Step-by-step list of devices to replace
Step one: set the warning threshold. For example, 20% battery for personal locators means the device should be replaced or recharged at the next inspection. The value is an example and depends on the length of the shift and the interval between inspections, so it must be matched to your own installation. Step two: filter the devices below the threshold in the pool view. Step three: remove from the list those in a multi-charger location with a rising trend, because they are already charging. Step four: enter the rest into a service ticket with the device number and its last position.
For transmitters, which do not report themselves in the same way as wearable devices, the swap plan is based on the life cycle: the battery is replaced about every 4 years as part of the maintenance service. Periodic inspections allow this to be verified in the hall, as described in the checklist for the transmitter network inspection.
Responsibilities and cost
The swap plan must be assigned to roles. The maintenance manager is responsible for the list and the deadline, the service provider for carrying out the replacement within the contract, and the shift manager for setting the device aside for service. Without such an assignment the list gets created, but nobody acts on it.
The maintenance cost in the sample offer is 7 PLN net per month per transmitter, that is 84 PLN per year. The battery replacement about every 4 years is included in this amount if the contract provides for it. For personal locators, the service rate is about 30 PLN net per month and includes the battery replacement. Indicative ranges from 2025-2026 deployments; individual quote.
Warning signs beyond the battery level
The battery level is not the only indicator. A device with increasingly rare reports, weakening signal strength or sudden drops in level may have a faulty battery despite a high reading. It is worth comparing devices from the same batch: if one discharges clearly faster than the rest, it is a candidate for inspection.
If a device goes silent, the procedure switches to the loss of signal mode: checking the last battery level, the last position and the event log. The details are described on the page about loss of signal from an employee.
Checklist
Video
Frequently asked questions
Can I rely on the charging status field?
No. Locators rarely report a real status, so the system infers charging from the battery trend in the multi-charger.
Which battery threshold should I use?
The value depends on the length of the shift and the interval between inspections. 20% is an example to adjust.
What about transmitters?
The swap plan is based on a cycle of about 4 years within the maintenance service and periodic inspections.
What should be done when a device goes silent?
Check the last battery level, the position and the event log after the connection returns.
Let us build your battery replacement plan
We will show the pool view with battery levels and help set the threshold and the division of roles in maintenance.
Let's talk