What makes up the beacon cost over a 4-year cycle
The life-cycle cost of a BLE beacon is the sum of expenses from installation to battery replacement after roughly 4 years. It consists of the price of the beacon with installation and the cost of keeping it running over time. Purchasing managers and plant directors should compare both elements together, because a low unit price without the battery replacement gives a false picture of the total cost.
The figures below come from a sample offer. The price of a beacon with installation is 170 PLN net per unit, and maintenance costs 7 PLN net per month. These are indicative ranges from 2025-2026 deployments; an individual quote depends on the number of beacons, the mounting height and the requirements of the zone.
Purchase and subscription: two funding models
With a purchase including installation, the plant pays 170 PLN net per beacon once. The battery replacement after about 4 years is then organised and paid for by the owner of the installation, together with labour and downtime. With a maintenance subscription, the monthly cost is 7 PLN net, which gives 84 PLN per year and about 336 PLN over 4 years per beacon. This amount covers the battery replacement roughly every 4 years as part of the service.
The difference between the models is not just the amount. A subscription transfers the risk of planning replacements to the supplier and gives a predictable monthly expense. A purchase gives a lower cost in the first year, but requires an own service plan, a stock of batteries and the inspections described in the checklist for periodic review of the beacon network.
Cumulative maintenance subscription of one beacon
Calculation for 200 beacons
A worked example for an installation with 200 beacons. Purchase with installation: 200 times 170 PLN is 34,000 PLN net, paid once. Maintenance subscription: 200 times 7 PLN is 1,400 PLN net per month, that is 16,800 PLN per year and 67,200 PLN over 4 years. Together, purchase and subscription over 4 years come to 101,200 PLN net, which is 506 PLN per beacon over the whole cycle.
In the sample offer, the subscription for the whole working system is 2,400 PLN net per month for 200 beacons, with the server and licences at 800 PLN (SLA) and two watches. After deducting 1,400 PLN for the beacons and 800 PLN for the server and licences, 200 PLN remains for the two watches. This breakdown is our own calculation and shows that the beacons are the largest, but not the only, monthly item.
The calculation does not include costs that are not on the card: travel, work at height, lifting platforms or downtime on the floor. These items must be priced separately and added to the life cycle, especially in halls with high mounting points.
How to read the cost when planning the budget
The budget is worth breaking down into three layers. The first layer is the initial investment: beacons with installation. The second layer is the monthly cost: the subscription, which scales linearly with the number of beacons. The third layer is a reserve for events not covered by the contract, such as moving a beacon after a hall refurbishment.
Linear scalability makes the conversation with the finance department easier: adding 20 beacons increases the subscription by 140 PLN net per month at a rate of 7 PLN. In the purchase model, 3,400 PLN must be added once for 20 units. Both numbers are the result of simple multiplication of the rates in the sample offer.
Structure of the monthly subscription for 200 beacons
What is not counted as the beacon cost
The server, licences and personal locators do not belong in the beacon cost: they are separate items. Licences and the server have their own rate, and a personal locator has its own monthly cost described on a separate page. Mixing these items leads either to an inflated unit cost of the beacon or to an item being overlooked in the budget.
Comparing offers requires a common basis: cost per beacon per month and total cost of the 4-year cycle. An offer that does not clearly state who replaces the battery and at whose expense cannot be compared with an offer that includes that replacement.
4-year cycle for 200 beacons
| Parameter | Value |
|---|---|
| Beacon price with installation | 170 PLN net |
| Beacon maintenance subscription | 7 PLN net/month |
| Number of beacons | 200 pcs |
| Period | 48 months |
Result: Purchase of 34,000 PLN plus subscription of 67,200 PLN gives 101,200 PLN net over 4 years, which is 506 PLN per beacon.
Note: Sample calculation on the assumptions of the sample offer; indicative ranges from 2025-2026 deployments; individual quote.
Video
Frequently asked questions
What does the 7 PLN beacon subscription include?
Maintenance of the beacon with battery replacement roughly every 4 years as part of the service. The server and licences have a separate rate.
What does 200 beacons cost per month under the subscription?
The beacons alone are 1,400 PLN net. The whole working system in the sample offer is 2,400 PLN net, including the server, licences and two watches.
Does the 170 PLN price include the battery replacement?
No. It is the price of the beacon with installation. The battery replacement is either in the subscription or the responsibility of the owner.
Does the calculation include hall downtime?
No. Travel, work at height and downtime must be priced separately.
Let us calculate the life cycle for your hall
We will prepare a sample quote for your number of beacons, split into purchase and subscription.