Who ticks what
Onboarding splits into two parts. The system administrator on the plant side is responsible for the account, the role and the workstation. The shift leader, from the agency or the plant, is responsible for showing the panel in action and for the test at the gate. Separating the roles prevents the situation where everyone assumes the other part was done by someone else.
The checklist is built so that a new guard's first shift is led by an experienced colleague and the first shift report is checked at handover.
Before the first shift: account and workstation
The security account is created by the system administrator. We recommend a separate account for each guard, because the log of entries, exits and denials should have an author. The workstation scanner is checked before the first shift, not during it, because the first shift already brings enough novelty.
If the workstation combines the gate with observing the plant map, a USB-COM scanner is needed, because only it opens the employee card window outside the gate panel, and only for the security, administration and secretariat roles.
Checklist points by onboarding stage
Denial test with voice and duplicate test
The best lesson for a new guard is a denial test done with a colleague, not a description in a manual. At a denial the panel shows a red banner and plays a voice recording: a missing training takes precedence over a missing permit, and the other denials have only the signal. The guard should hear both situations and know what to do with the person.
The second test is the duplicate. A repeated scan of the same code within a few seconds is ignored, and the panel shows a message that the scan was ignored, not an error. A guard who does not know this reports a fault that does not exist.
People-on-site list and revoking a badge
The guard should be able to find the list of people on site and know that a person who forgot to scan their exit will be checked out automatically only after 12 hours, in a run of the task that starts every 3 hours. Until then the list may contain people who are no longer there.
The guard should also know the procedure for a lost badge: report it to the administrator, revoke it and issue a new badge with a new random code. The badge history is kept.
The limits of the role: what a new guard does not do
A new guard often tries to help and close the matter on their own. In the panel there are limits: the view of today's work is read-only, and security does not suspend, resume or close permits. There is also no separate admit button, because the scan itself is the control act.
The shift leader's task is to explain this at the start, so the new guard does not look for functions the security role does not cover.
Checklist
Video
Frequently asked questions
How long does onboarding a new guard take?
It depends on the agency. The sample calculation assumes 2 hours of training, half an hour of gate test and one hour of mentor time, but this is an assumption to be replaced with real time.
Can a new guard work on a colleague's account?
We advise against it. The log then loses the author of its entries, and explaining events after a shift becomes difficult.
What to do when the scanner does not open the window outside the panel?
Check the scanner mode and the account role. The window opens only with USB-COM and only for the security, administration and secretariat roles.
Does onboarding need repeating after a guard's break?
A short denial and duplicate test with the shift leader is enough. The account and role stay unchanged, if the administrator has not deactivated them.
Let us rehearse the first shift before the first shift
We will run a trial shift with your agency on a test account: the account, the scanner, the denial with voice and the people-on-site list.