What the window opened by a scan outside the panel does
A scanner on a USB-COM link, connected to a security workstation, opens the employee card window even when security is looking at a different screen of the system than the gate panel. The guard scans a badge or card and the system shows the person's card without the need to go to the gate panel.
The solution makes sense at workstations that combine several tasks: the gate, observing the map and dispatching. Where the guard works only in the gate panel, a window outside the panel is not needed, because the verdict appears on the gate screen.
Necessary conditions
A window opened by a scan outside the panel appears only for the security, administration and secretariat roles, and only with a USB-COM scanner, not with a keyboard-emulation scanner. Both rules must be checked before installation, because the workstation's expected behaviour depends on them.
- The account logged in on the workstation has the security, administration or secretariat role.
- The scanner works on a USB-COM link, not in keyboard-emulation mode.
- The scanner reads the codes used at the plant: QR badges or card numbers.
- The workstation has a browser with the system logged in and access to the plant network.
Workstation tests after configuration
Workstation configuration step by step
The sequence below shortens the time to deploy and lets you tell a scanner fault from a role fault. Note each step in the workstation protocol.
Step 1: choosing the scanner's working mode
Set the scanner to USB-COM link mode according to the manufacturer's documentation. If the scanner was delivered in keyboard mode, the window outside the panel will not work, even when a scan in the gate panel works correctly. This is the most common reason for a report that the function does not work.
Step 2: checking the account role
Log in with the guard's account and confirm it has the security role. If the workstation is also used by an administrator or the secretariat, check their roles separately, because the window will not open for others.
Step 3: test outside the gate panel
Open the plant map or the list of people on site and scan the test badge. The correct result is a window with the employee card. No window while a scan in the gate panel works points to the scanner mode or the account role.
Step 4: duplicate scan test
Scan the same code twice within a few seconds. The repeated scan is ignored as a duplicate, and the panel shows a message that the scan was ignored, not an error. Record that the guard was informed about this.
Step 5: denial test
Scan the badge of a person who lacks a training. At the gate the panel shows a red banner and plays a voice recording, and a missing training takes precedence over a missing permit. Check that the speaker at the workstation is on and that the volume is audible over the normal noise at the gate.
Proof for the audit and for the talk with the agency
After configuration record in the workstation protocol: the date, the workstation name, the scanner type, the role of the test account and the result of the four tests. Such a protocol is evidence for the plant that the workstation meets the requirements, and for the agency that the problem is not caused by the configuration on its side.
In the system log a denial is written as a denial entry, and the person with a denial is not counted as present on site. This means the denial test does not falsify the people-on-site list, provided it was run on a test account and a test badge.
Most common mistakes
The most common mistake is replacing the scanner with a keyboard-mode model during an equipment change: the workstation still works in the gate panel, but the window outside the panel disappears without a message. The second mistake is assuming the window opens for every role. The third is not repeating the test after a browser or workstation system update.
InnerWeb does not sell readers or scanners, so the choice of model and its working mode stay with the plant or the agency. The panel accepts a scan of a QR badge or card number regardless of the scanner manufacturer.
Video
Frequently asked questions
Why doesn't the window open although the scanner works?
Most often the scanner works in keyboard mode, or the account does not have the security, administration or secretariat role. The window outside the panel works only with USB-COM.
Is a keyboard-emulation scanner suitable for the gate?
Yes, it works correctly in the gate panel. It does not open the employee card window, however, when the guard is looking at a different screen of the system.
Will the denial test spoil the people-on-site list?
No. A scan with a negative verdict writes a denial entry, and the person with a denial is not counted as present on site.
Does InnerWeb supply scanners?
No. The panel accepts a scan of a QR badge or card number, and scanners and readers stay with the plant or the agency.
Let us test the USB-COM workstation
During the demo we will show the employee card window on the map screen and go through the scan, duplicate and denial tests together with your IT team.
Let's talk