Morning: before the service crew enters
In the morning the coordinator has a few minutes to check that everything is ready. He checks the status of the permit and the list of employees of the external company, and then compares the required certificates with what is valid in the system. When a permit is created the system automatically checks the required, valid certificates, but it is worth making sure that nothing has changed after the permit was opened, for example that the crew has not been supplemented with a new person.
The course of the permit follows a template linked to the location and the tasks. The coordinator therefore checks whether the preparation tasks are right for the machine being serviced: whether this service needs additional tasks that the template does not foresee.
During: what is visible on the map and in the list
During the service the coordinator does not have to stand by the machine. The system determines the employee's position from BLE signals from beacons, without GPS, and the online map in the 2.5D isometric view shows the building volumes, the employees and the places of work. A permit covering several locations is drawn as a single outline, so the whole scope of the service is visible at once.
After a person enters the place of work the system can add the employee to the permit at that location, and after leaving it can remove them from the list, so the working time follows the location. The coordinator checks whether the list of people at the machine matches the list submitted in the permit, and whether there is anyone inside the outline who is not on it.
Checklist control points across three moments of the day
After the service: closing and handover of the machine
When the work is finished, the coordinator checks whether the closing tasks are ticked off, whether all employees have left the place of work, and whether the permit has closed by itself or has been closed manually. When auto-closing is enabled in the template, the system closes the tasks and the permit once all tasks are closed and the employees have left the place of work.
The permit time and the working time of each employee are counted separately. The coordinator records both values in the service summary, because the first concerns the whole work window and the second the settlement with the service company. The further steps of accepting the machine are described in the separate checklist for production.
What to do when the permit does not close
When the permit remains open despite the work being finished, the most common causes are an unclosed task, a person who still appears at the place of work, or auto-closing switched off in the template. The coordinator checks them in this order.
How to use this checklist in practice
The checklist works best when the coordinator goes through it in the same order each time and records the result in the permit or in the shift log. After a few weeks it becomes clear which points fail most often: usually an incomplete employee list in the morning, or a person who was not removed from the place of work after the service. These two places are worth reinforcing with a procedure before the plant tightens its requirements.
For plants with several services a day, a division works well: the shift coordinator is responsible for the morning and closing points, and the duty foreman for observation during the work. The division is added to the instructions, and the system gives both sides the same view of the permit and the map. As a result the conversation about the service is based on the same data, not on accounts from the hall.
Checklist
Video
Frequently asked questions
Does the coordinator have to be physically at the machine?
Not at all times. The map and the employee list show who is at the place of work, but the coordinator's presence at admission and acceptance depends on the plant's procedure.
How does the system know that the technician has left the place of work?
From BLE signals from beacons: after leaving the location the employee can be removed from the permit list. Accuracy depends on the density of beacons; in a building we assume one per 100-200 m².
Can the checklist be adapted?
Yes, it is a starting point. The plant adds to it the requirements of its own machine and procedures.
Let us walk through a service day in a demo
We will show the morning check, the map during the service and the closing of the permit, on an example of a plant close to yours.