InnerWeb
Skip to main content

Checklist before lone work at a pumping station

Sending one person to a pumping station requires five things to be checked before the vehicle doors close: the alarm carrier, connectivity, inactivity thresholds, how SOS works and who receives the alarm. Missing any one of them turns the system into an appearance of safety. Below is a checklist with comments for the crew supervisor.

52 s
median alarm closure time in a working deployment
Source: internal product card
7 of 10
stops cancelled by the worker themselves
Source: internal product card
3 s
SOS cancellation window
Source: internal product card

Before you send one person

A pumping station may have no coverage, no permanent staffing and an entry into a space where a person can lose consciousness with no witnesses. Lone work is acceptable only when there is a mechanism that notices the lack of response and calls for help. The checklist below turns this into five decisions to confirm before departure.

1. Alarm carrier: watch, active card or application

Check that the worker has a charged device that sends the alarm. The worker carries a BLE device that periodically sends information about the transmitters it hears, the signal strength, the battery level and the status. The battery level is one of the data points in this message, so the coordinator can see whether the device is ready.

The watch is the carrier for SOS and inactivity. The mobile application analyses the phone's sensors, while the server measures time independently. If the worker has only a phone, confirm that the application is running.

Alarm timing pattern on an LTE watch

Alarm timing pattern on an LTE watchBar chart: 20 seconds to warning, 30 seconds to alarm and a 3-second SOS cancellation window.0102030sNo movement before warning: 20 s20 sNo movement before warningWarning to alarm: 30 s30 sWarning to alarmSOS cancellation window: 3 s3 sSOS cancellation window
Source: Internal product card: sample LTE watch warning pattern and the SOS description

2. Connectivity with the facility

Ask how the alarm will reach the dispatcher from this pumping station. Pulses from active LoRa cards feed the same inactivity mechanism as the data from the application. A LoRa bridge translates the frames into the existing API, so the watch does not need Wi-Fi. At pumping stations without mobile coverage this is often the only route.

For a facility without full Wi-Fi coverage, a variant with a repeater gateway, which forwards frames to a gateway with internet access, is documented. It is a decision to be implemented on a real facility, so before assigning lone work, confirm whether the facility has working connectivity and not just a plan to add it.

If the client's network blocks all outbound traffic from the application host, the alarm webhooks are stored durably and an external poller collects them over an inbound channel, so the alarm is not lost.

3. Inactivity thresholds

Response times, confirmation times and inactivity sensitivity thresholds are configured in the panel. Before departure, check that the threshold suits the work at the pumping station: longer for a calm inspection, shorter for work inside a chamber.

A sample pattern from an LTE watch can be a starting point: 20 seconds without movement gives a warning, and a further 30 seconds without a response triggers the alarm. A working deployment shows a median alarm closure time of 52 seconds, and 7 in 10 stops are cancelled by the worker themselves, so the threshold is workable in daily practice.

4. How SOS works

The SOS alarm on the watch is raised with a triple press or a long press of the button, with a three-second countdown during which it can be cancelled. Ask the worker to show how to raise it and how to cancel it. Knowledge from training held six months earlier fades.

SOS is active and unconditional: it does not depend on the inactivity settings or the location configuration, and it does not close automatically when movement resumes. Once raised, it starts the emergency response chain: a messenger notification and automatic phone calls.

5. The person receiving the alarm

The most common gap is an alarm that nobody receives. After the threshold is exceeded, the system sends a push notification and an e-mail to the people responsible, creates an alarm permit from the ALARM template and marks the alarm on the map. Before departure, confirm who is that person in the given shift, that they are reachable and that they know the location of the pumping station.

It is worth agreeing a deputy: if the first person does not confirm, the alarm goes to the second. Keep names and phone numbers in the system configuration, not on a note by the board.

Closing the alarm

An inactivity alarm closes by itself when the worker moves again, while SOS is closed by a person. Establish who has the right to close SOS and on what basis.

Checklist

Video

Frequently asked questions

Is a phone with the application enough?

The mobile application analyses the device's sensors and works as an inactivity carrier, but at facilities without coverage it is more sensible to have a carrier with LoRa connectivity. The choice depends on the coverage at the given facility.

Is the inactivity threshold the same for all work?

No. Thresholds are configured in the panel, and it is worth setting them separately for an inspection, a round and work inside a chamber.

What if the person receiving the alarm does not respond?

Agree a deputy in the configuration. SOS also starts the emergency response chain with automatic phone calls, which continues until a person closes it.

Prepare crews for lone work

Book a call with InnerWeb and we will set up together the carrier, connectivity, thresholds and alarm chain for your pumping stations.

Let's talk