What a patrol route is made of
The site defines checkpoints on the map, each with its own checklist, and combines them into routes per department. A checkpoint is a specific place: a valve, a control cabinet, a row of pumps, the entrance to a chamber. A checklist is the set of questions the person on patrol must confirm at that place.
A route is an ordered set of points for one department or one task, for example a round of a pumping station, a round of the mechanical section of a wastewater plant, or a round of the valve chambers. Separate routes per department make it possible to assign responsibility and scope without one large list for the entire site.
Step 1: choose the points that matter
Start with the points where risk or quality control happens: places often cited in incidents, equipment subject to inspection, places where a person's presence is required. Avoid the temptation to mark everything, because an overly long route is tiring and lowers the reliability of the answers.
A good practice is to start with 8-13 points per route. This is a number that the person on patrol can walk in one cycle without cutting corners, and that the coordinator can review without scrolling.
Sample split of route points by confirmation method
Step 2: write a checklist for each point
A checklist at a point should contain closed questions: yes or no, a reading value, a note with the option of a photo. An open question such as is everything in order does not give data for analysis.
Documents, audio and video are assigned at every level of the site hierarchy (hall, area, line), with inheritance down the tree, and a document can be attached to a checklist item. This way a work instruction or a short film showing the correct position of a valve is at hand exactly where it is needed.
Step 3: confirm the location by BLE or QR
Items of an OHS inspection can be linked to a repeatable point with location confirmed by BLE or QR. This is the difference between a declaration and proof: a worker who answers the list must first be at the point.
Where there is a transmitter network, confirmation can come from the position of the worn device. The worker carries a BLE device that periodically reports the transmitters it hears, the signal strength, the battery level and its status, and from this the platform knows where the person is. Where there are no transmitters, a QR sticker at the point is enough, and it has to be scanned to open the list.
Both methods can be mixed in one route. Points inside a building can use BLE, while a distant valve chamber uses QR.
Steps 4 and 5: assemble routes per department and assign people
Routes are assembled separately for each department: the electrician's round has different points and different lists from the mechanic's, and the OHS team has its own. Each department is responsible for its route, and the coordinator sees the overall picture.
Agree the assignment of people to routes with the shift pattern. A route that is walked once per shift should have a named person for each shift, not a single name for the whole day.
Step 6: maintenance and proof for an audit
Changes to permits, the taxonomy of hazardous work, training results, automation rules and patrol routes are saved with their author and time. When someone changes a point or a list, the history shows who and when.
A quarterly review of each route lets you remove points that have proved unnecessary and add those that have emerged from incidents. The route is a living document, not a one-off configuration.
Inactivity alarm on the route
A patrol is often walked by one person. When inactivity detection is switched on, a lack of movement triggers a warning and an alarm, and the position shown on the map makes it easier to reach the person. The patrol route and lone-work safety run on the same data.
Checklist
Video
Frequently asked questions
Does a patrol route need a transmitter network?
No. The location at a point can be confirmed with a QR sticker, and BLE transmitters are an option where the facility uses them.
Can a document be attached to a checklist?
Yes. A document can be attached to a checklist item, and documents, audio and video are assigned at every level of the site hierarchy with inheritance down the tree.
Who can see the history of changes to a route?
Changes to patrol routes are saved with their author and time, so the coordinator or auditor can see who changed a point or a list, and when.
Build your first patrol route
Book a call with InnerWeb and prepare a patrol route on one site, with checklists and location confirmation.
Let's talk