InnerWeb
Skip to main content

Gate acceptance tests before the clean zone: a list for QA

Gate acceptance before a clean zone is the moment when the quality department checks whether the rules from the procedure really work in the system. The list below contains thirteen test scenarios: a guest without a declaration does not enter, exit works, a visit does not skip training, the declaration expires at midnight, and the declaration language comes from the account.

13
test scenarios on the list
Source: list in this material
5 min
oral confirmation window that records the entry

How to run the acceptance

An acceptance test only makes sense if every scenario has its expected result written down before the attempt. The quality department prepares test accounts: a guest with a declaration, a guest without a declaration, a guest after training, a guest with a planned visit, and an internal employee. Each scenario ends with a record: result, date, tester.

The declaration requirement is switched on in the administrator panel and is disabled by default, so the first step of acceptance is to check that the setting is on at the right installation. The declaration text is a plant text field with an optional English version, so the test also covers checking that the guest sees the text approved by the quality department.

Scenarios by area

The thirteen scenarios are divided into five areas. The number of scenarios in each area is shown in the chart.

Declaration gate (4 scenarios)

A guest without today's declaration does not enter, and the entry is not recorded. The gate answers "declaration required", does not create a refusal entry in the SIEM log and does not add the person to a training group. A declaration submitted through any of the five channels unlocks entry. A guest without a declaration who is confirmed orally by the guard within 5 minutes gets the entry recorded, and the guard appears in the record.

Visit and training (3 scenarios)

A guest with a planned visit must still have training, qualifications and an active account, because the visit removes only the work permit requirement. A guest who has passed group training under supervision still goes through the declaration gate. The visit button in the security panel appears only when the only missing item is the work permit, and with other missing items the server returns 409 without recording anything.

Calendar day (2 scenarios)

A declaration signed yesterday at 23:59 is invalid today, and one signed today at 00:01 is valid until midnight. The test is run on accounts with declarations dated on two different days, and it confirms that the Europe/Warsaw time zone decides.

Declaration language (2 scenarios)

When entering from a link with a code, a badge or a card, the interface switches to the account language, and when choosing from a form, the choice made by the person applies. When training in the account language is missing, the gate requires training in Polish instead of skipping it.

Exit (2 scenarios)

A person already on site can always leave, even without today's declaration. An internal employee, exempt from the declaration, passes the gate without one. Both tests protect the evacuation list from people who would remain there until the night checkout.

Test scenarios by area

Test scenarios by areaBar chart: declaration gate 4 scenarios, visit and training 3, calendar day 2, language 2, exit 2.01234scenariosDeclaration gateDeclaration gate: 4 scenarios4Visit and trainingVisit and training: 3 scenarios3Calendar dayCalendar day: 2 scenarios2Declaration languageDeclaration language: 2 scenarios2ExitExit: 2 scenarios2
Source: List of scenarios from this material (13 in total)

When to repeat the acceptance

It is worth repeating the acceptance after every change to the declaration text, after changes to the administrator panel settings and after a system update. The short version covers the four declaration gate scenarios and the two exit scenarios, because these decide whether a guest enters and whether the list of people on site stays accurate. The quality department records in the protocol which version of the declaration text applied on the test day, and the SHA-256 hash stored with each declaration makes it possible later to show what text the guest saw.

Recording the result and evidence for the audit

The acceptance protocol should contain the results of all thirteen scenarios, screenshots of the gate responses and the declaration rows from the database. The database holds one declaration row per person per day, and a repeated confirmation on the same day returns the first entry, so testing two channels at the same time should produce no duplicate or error. Each declaration stores a SHA-256 hash of the text the person saw in their language, which is worth checking after any change to the text.

The protocol is part of the plant's documentation, and its scope is set by the quality department in line with its own validation procedures. The EU GMP guidelines (EudraLex, Volume 4) cover the chapter on personnel and Annex 1 on the manufacture of sterile medicinal products, whose revised version applies from 25 August 2023.

Checklist

Video

Frequently asked questions

Where should the acceptance start?

By checking that the declaration requirement is switched on in the administrator panel and that the guest sees the text approved by the quality department. It is off by default.

Can a test of two channels at once damage the database?

No. There is one declaration row per person per day, and a repeated confirmation on the same day returns the first entry, with no error and no duplicate.

Should the test be run on an employee's account?

Only as an exemption scenario. Internal employees and accounts without a company do not submit a declaration, because the document concerns guests.

Sources

Let's accept the gate together with your quality department

We will prepare test accounts and an acceptance protocol covering the thirteen scenarios for your procedure. Book a conversation with InnerWeb.

Let's talk