InnerWeb
Skip to main content

No-movement alarm: dispatcher checklist for the first minutes

A no-movement alarm means that the employee's phone and the server agree that the person is not moving. The dispatcher then has a few minutes to establish the position, send help and check who else is on site. The list below sets these steps in the order in which they are usually taken.

13 s
refresh interval of the list of people on site
Source: spec sheet
6
groups into which the evacuation list divides people
Source: spec sheet

What a no-movement alarm means in the system

A no-movement alarm is two-sided detection: the phone analyses the sensors, the server independently measures the time, and the full alarm starts only when both agree. In this way a single phone set down on a table does not trigger a full alarm, and real stillness is confirmed by two independent routes.

After the stillness threshold is crossed, the system sends push and e-mail notifications, creates an emergency permit from the ALARM template, marks the alarm on the map and can trigger an external webhook. The dispatcher does not have to set anything up by hand: they have a ready starting point.

Minutes 0-1: confirm and locate

The first step is opening the alarm on the map and reading the person's last position. The position comes from transmitter signals averaged on the map, not from GPS, so depending on coverage it indicates a zone or a road section.

The second step is checking whether the person was working alone and whether they hold a permit for especially hazardous work. This information comes from the emergency permit and the person's data.

Dispatcher steps in successive minutes of an alarm

Dispatcher steps in successive minutes of an alarmBar chart: three dispatcher steps each in minutes 0-1, 1-3 and 3-5.0123number of stepsMinutes 0-1: 3 number of steps3Minutes 0-1Minutes 1-3: 3 number of steps3Minutes 1-3Minutes 3-5: 3 number of steps3Minutes 3-5
Source: Count of steps from the checklist on this page; the figures count steps, not time measurements

Minutes 1-3: contact and help

The dispatcher tries to make contact by phone or radio. If contact fails, they send the nearest person from the map, or a rescue team, to the last known place. If the plant has an external webhook connected, its reaction starts at this moment as well.

It is worth recording in the emergency permit, at the same time, who was sent and at what hour. That record is later evidence of how the event unfolded.

Minutes 3-5: list of people on site

If the situation may be linked to a hazard to the installation, the dispatcher opens the evacuation list. It is one screen showing who is on site now, refreshed every 13 seconds, which divides people into six groups, with a one-page printout per group for the coordinators at the assembly point.

The evacuation route and the assembly point are not functions of the system: the system shows the list of people and the last position. The decision on evacuation and the route is made by the plant according to its own procedures.

After the event: closure and lessons

When the person is safe, the dispatcher closes the alarm and describes the cause. Repeated alarms in one place may point to gaps in transmitter coverage or to stillness thresholds that are too short, and these are topics for review.

Good practice is to discuss each alarm with the team within a few days. The conclusions feed into the thresholds, the procedures and the calibration of the number of people working alone.

Checklist

Video

Frequently asked questions

When does the full no-movement alarm start?

Only when the phone, which analyses the sensors, and the server, which independently measures time, agree that there is no movement.

What does the system do automatically after an alarm?

It sends push and e-mail notifications, creates an emergency permit from the ALARM template, marks the alarm on the map and can trigger an external webhook.

Does the system suggest an evacuation route?

No. It shows the list of people on site and the last position; the plant sets the route and the assembly point.

How often is the list of people on site refreshed?

Every 13 seconds. People are divided into six groups, with a one-page printout per group.

Rehearse the no-movement alarm on a demo

Book an InnerWeb demo and go through the first minutes of a no-movement alarm with dispatchers on a sample plant map.

Let's talk