Starting point: training valid yesterday, not today
Consider a production plant with several contractors working in the hall: machine service, industrial cleaning, installation work. Each of them sends its own people onto the site, and those people must hold a valid OHS induction training. In this scenario, the training of one service technician expired the previous evening. Nobody noticed, because the expiry date did not fall on a working day, and the reminder, if it arrived at all, got lost in the coordinator's inbox.
The first shift starts at 6:00, so the gate is busiest at that time. Security has a few dozen seconds per person. That is why the decision to let someone in cannot rely on a guard's memory or on a paper list from last week. It has to come from one source that knows the current status of trainings, qualifications and accounts of everyone entering the site.
In InnerWeb, the trainings and qualifications of employees, including contractor staff, are kept in one place, together with medical checks and training results. It is the same database that the work permit module uses, so the gate and the permit rely on the same data.
Scan at the gate: what security sees
The employee presents a QR badge or an RFID card. The guard scans it in the panel at the gate. The panel does not show raw data, only a verdict: whether this person may be on the site. The verdict has four elements: valid trainings, qualifications for hazardous work, a permit in progress and an active account.
In our scenario, three of the four elements are in order: the account is active, the qualifications for work near traffic are valid, and a permit for today is in preparation. One element is missing: the OHS induction training. The panel states this clearly, with the name of the missing element, so the guard does not have to interpret anything or call the OHS department to find out the reason.
An important point for a later audit: the scan at the gate is itself a control act and records the entry. A trace appears in the system regardless of whether the guard decides to admit the person or to stop them at the gate. This makes it possible to show later that the check was carried out at a specific time and with a specific result.
Calls to the coordinator with 12 people without training
What the system does in the background after finding a gap
When an employee without a valid OHS training is scanned at the gate, the system creates an alarm permit. It is a document generated automatically, which does not go through the preparation phases. Its creation starts the clock: the case should be resolved within a set time.
At the same time, the automation notifies the coordinator of that employee's company. This is an important detail: the notification goes to the coordinator of the actual employer of the scanned person, not to the control account under which the alarm permit is formally created. In this way the information reaches someone who can send the employee to training, not to security, which already knows about the problem.
If several people from the same company lack training, the system does not call the coordinator for each of them. Notifications are aggregated: one call, one e-mail and one channel report per company within a rolling 55-minute window. A combined call reads out up to 5 surnames, and when there are more, the message adds "and others".
What security and the contractor's foreman do
The system provides the verdict and the notification, but the decision on what to do next belongs to people and to the site procedure. In this scenario we assume a typical rule: an employee without a valid training does not enter the hall to work until the training is completed. The plant may set this as a hard block or as a supervised path, depending on its policy.
The contractor's foreman, standing with the crew at the gate, then has three real options. He can send the employee to induction training if the plant provides it on site, for example on a tablet. He can change the crew composition for today and add someone with a valid training. Or he can postpone the entry until the gap is closed. Each of these decisions is faster when the reason for refusal is clear already at the gate.
Security records the course of the event in the system and does not assess the matter on its own. Admission to work, in the sense of the permit, remains with the authorized persons, and their decisions are recorded in the same way as the scan.
- Security scans the badge and reads the verdict with the name of the missing element.
- The contractor's foreman chooses: training on site, a change of crew composition or postponing the entry.
- The company coordinator receives a combined message about all gaps within the 55-minute window.
- The OHS manager sees the event in the training report and can compare it with previous days.
Results: the numbers of this scenario
Let us count what the aggregation of notifications changes, assuming an example: in one morning window, 12 employees of one contractor have expired training. Without aggregation, the coordinator would get 12 separate calls within a few dozen minutes, each with one surname. With aggregation, he gets one call that reads out 5 surnames and the phrase "and others", while the full list is in the e-mail and in the report.
The sending module checks the buffers every 8 minutes, so the delay between the scan and the combined notification is limited by the 55-minute window and the checking step. This is a trade-off: the coordinator is not flooded with calls, and the information still arrives within the first hour of the shift, when the crew can still be reorganized.
The second effect is less visible but more important for the audit. Instead of discovering a training gap after an incident, the plant has a documented moment of detection, the recipient of the notification and the reaction time. This is proof that the control works, not merely a declaration that it does.
Conclusions for the plant and the contractors
The first conclusion concerns sequence: the cheapest way is to detect a missing training before the working day, and the most expensive is at the gate at 6:00. That is why the gate scenario is a safety net, not the primary mechanism. The foundation is the warnings about approaching expiry that the system sends to employees and employers in advance.
The second conclusion concerns data responsibility. The verdict is only as good as the data it rests on. If a training result lands on a duplicated account or is not entered at all, the gate will report a gap to a person who did pass the training. It is worth having a documented procedure for correcting such a case and a person who is authorized to carry it out.
The third conclusion: the scenario does not require replacing existing systems. If the plant has an access control system, its card events can flow into InnerWeb and end in the same training verdict. InnerWeb does not manufacture readers or access control cards; it connects their events with qualifications and permits.
Video
Frequently asked questions
Does the gate physically block entry?
The verdict informs security and records the scan as a control act. Physically blocking the passage depends on integration with the plant's access control system and on the adopted procedure.
Who receives the notification about missing training?
The coordinator of the actual employer of the scanned person, not the control account under which the alarm permit is created.
Does every missing training result in a separate call?
No. Notifications are aggregated: one call, one e-mail and one channel report per company within a rolling 55-minute window.
Do additional trainings also block entry?
No. At the gate, what counts is the mandatory induction; additional trainings outside it are not treated as required.
Let's talk about conditional admission
We will show, using your plant as an example, how trainings and qualifications become a condition for entering the site. Book a short conversation or a demo.
Let's talk