InnerWeb
Skip to main content

Case: 5 seconds and 400 m, duplicate or stop

A point appears on a forklift route in the warehouse, several hundred metres away from the previous one. The system analyst has to decide whether it is a duplicated beacon or a vehicle that really stood still and then drove on. The neighbouring route points and the time gap between them settle the question.

151 of 651
jumps came from the return trip of one beacon
Source: documentation of the location function
55 m
jump distance threshold in the analysis
Source: documentation of the location function

Symptom: a route jump on the online map

A delivery route on the online map is a path between the positions of beacons detected by the phone, not a GPS track. Each route point is a record from the moment the device detected a beacon and was placed at that beacon's stored position.

If a vehicle stands at a loading dock, and then a point appears on the map several hundred metres away, after which the route returns to the dock, the analyst sees a characteristic jump. It looks like teleportation, and the vehicle did not cover that distance.

Two explanations and how to tell them apart

The first explanation: two physical beacons several hundred metres apart broadcast the same major:minor identifier. The system recognises them as one entry, so the vehicle near each of them is placed at one stored location. The second: the vehicle really stood still, and the next point arrived only after a long pause, because the beacon was not heard.

The key is time. A 5 second gap between a real point and the jump points to a duplicated beacon, because in that time a vehicle cannot cover several hundred metres. A long gap means the vehicle was stopped, not that the beacon is faulty.

Jump rule used in the analysis

In the route jump analysis, a jump was defined as a point more than 55 m away from the previous one, after which the next point returns to less than 21 m from that previous point. This pattern separates a single outlier from normal driving, in which consecutive points move further apart.

Neighbouring points instead of the stored position

The place where the vehicle actually was when the beacon was detected is indicated by the neighbouring route points of the same locator, not by the stored beacon position. This matters, because in the case of a duplicate the stored position is exactly what is wrong.

Route jumps at one of the sites

Route jumps at one of the sitesPie chart: 151 of 651 jumps came from one beacon, 500 from other causes.Return trip of one beacon: 151 jumps (23.2%)Other: 500 jumps (76.8%)651jumpsReturn trip of one beacon151 jumps (23.2%)Other500 jumps (76.8%)
Source: Location function documentation: 151 of 651 jumps

Arithmetic: could the vehicle have covered that distance

A simple calculation lets you judge the plausibility of a jump without looking into the beacon data. Assume a forklift moving through the warehouse at about 2 m/s, which is 7.2 km/h, a typical speed inside a hall (example assumption). In 5 seconds it covers about 10 m. A distance of 400 m would take it about 200 seconds, which is more than 3 minutes.

So if 5 seconds pass between the real point and a point 400 m away, it is physically impossible for the same vehicle to be in both places. If 3 to 4 minutes pass, the jump is possible as a drive, and the question becomes whether the route was continuous or interrupted by a stop.

This reasoning does not require access to the warehouse. Timestamps and positions from the route history are enough.

What the administrator should do

If the jump is a duplicate, moving the stored position does not remove the error; it only moves it to a second installation site. The real fix is to find one of the physical beacons and re-code it, or to temporarily disable the identifier from positioning.

Disabling works by changing the major number to a value that no device broadcasts; the position, minor and location stay, so restoring it is a one-number change. Remember, however, that a disabled identifier switches off both twin devices, including the working one, so that navigation point is lost until a field visit.

At one site, 151 of 651 detected jumps came from the return trip of one beacon and disappeared after it was disabled in positioning. That is about 23 percent of the jumps removed by one change.

Time to cover 400 m vs. gap between points

Time to cover 400 m vs. gap between pointsBar chart: a 5 second gap against the 200 seconds needed to cover 400 m.050100150200sGap in the data: 5 s5 sGap in the dataNeeded at 2 m/s: 200 s200 sNeeded at 2 m/s
Source: Example calculation: 400 m at 2 m/s

Conclusions from the case

Before anyone drives to the warehouse to look for a beacon, it is worth counting the time gaps. A jump after 5 seconds is a duplicate; a jump after a long pause is most often a stop.

Route point records are immutable, so correcting a beacon position applies only to future deliveries. Old routes keep the jump, and the people who base their reports on history need to be told about this.

Video

Frequently asked questions

How quickly can you tell that it is a beacon duplicate?

Compare the time gap with the distance. If 400 m appears after 5 seconds, no vehicle could have covered it, so it is a duplicated identifier.

Will correcting the position fix old routes?

No. Route points are immutable records of the signal moment, so the correction works for future deliveries.

Is disabling the identifier reversible?

Yes. Changing the major number to an unused one keeps the position, minor and location, so restoring it is a one-number change.

Let's review the routes in your warehouse

We will show how to read route jumps and tell a duplicate from a stop on your data.

Let's talk