InnerWeb
Skip to main content

Multi-chargers and tracker charge status: best practices for the warehouse

Locating devices rarely report their actual charge level, so the system infers it from the battery trend at the location of the multi-charger. How well this mechanism works depends on how the warehouse manager sets the location and name of the charger. Below are the practices that keep this in order.

5
minimum number of transmitters in a reading for a 3D position
Source: karta
3
states inferred from the battery trend (rising, falling, stable)
Source: karta

How the system determines the charge status

Locating devices rarely report their actual charge level. The system therefore infers it from the battery trend at the location of the multi-charger. If the battery level rises, the device is charging. If it falls, the device has been taken off the charger. If it is stable, the system keeps the previous status.

The inference is reliable only when the system knows that the device is at the multi-charger. That knowledge comes from the location. Hence the whole practice comes down to describing well the place where the charger stands.

Good practices for setting up a multi-charger

The warehouse manager of trackers is responsible for making sure the location of the charger is unambiguous, stable and named so that it cannot be confused with another point.

A separate location for each multi-charger

Each multi-charger should have its own location, not one shared with a warehouse shelf or an office. When the charger shares a location with a place where devices are also put down without charging, the battery trend will show charging where there is none.

A name that says it is a charger

The name of the location should state the function of the place. A name such as 'Tracker charger, warehouse, rack 3' tells both the map user and the administrator what it is. Generic names, such as 'Point 7', help neither the diagnosis nor the reports on the state of the fleet.

A fixed place for the charger

If you move the charger, change its location in the system as well. Otherwise the system will infer charging in a place where the charger no longer is, and devices will return to the pool with under-charged batteries.

Sufficient coverage by transmitters

The system must see the tracker in the room with the charger. The 3D position mode requires readings from at least 5 transmitters and is determined by an evolutionary algorithm. The simpler mode points to the nearest location from the signal. In a small room of the tracker warehouse it is worth checking which mode actually works and matching the number of transmitters to that answer.

Inferring charge status from the battery trend (schematic)

Inferring charge status from the battery trend (schematic)Schematic of three battery trend states: falling, stable and rising, with the matching charging inference.-101battery trend (-1 falling, 0 stable, 1 rising)Falling: taken off the charger: -1 battery trend (-1 falling, 0 stable, 1 rising)-1Falling: taken off thechargerStable: status unchanged: 0 battery trend (-1 falling, 0 stable, 1 rising)0Stable: status unchangedRising: charging: 1 battery trend (-1 falling, 0 stable, 1 rising)1Rising: charging
Source: Illustrative schematic of the rule described in the internal record, nominal values

Mistakes that distort the charging inference

The most common mistake is a charger location shared with another place. The second is a name that does not match the function of the place. The third is moving the charger without changing its location in the system.

The fourth mistake is more subtle: expecting the system to show charging immediately. The battery trend requires several readings, and a stable level means keeping the previous status. A short observation after plugging in may not yet show a change.

  • A charger location shared with a shelf for put-down devices.
  • A name that does not say it is a charger.
  • A charger moved without updating its location.
  • Expecting an immediate indication after plugging in the device.

Practical tips for the tracker pool

In a tracker warehouse a daily cycle works well: after a shift, all devices go back onto the charger, and in the morning the manager reviews the list of devices with low battery. This list is derived from the battery trend, so a correct charger location translates into the reliability of this review.

It is worth setting a threshold below which a device does not leave the warehouse, and a person who watches over it. A simple rule written into the instructions saves questions during the shift.

Checklist

Video

Frequently asked questions

Why can the system not tell by itself that a device is charging?

Locating devices rarely report their actual charge level. The system therefore infers it from the battery trend at the location of the multi-charger.

What does a stable battery level mean?

The system keeps the previous status. If the device was charging before, it is still treated as charging until a fall is noticed.

How many transmitters are needed in the charger room?

The 3D position mode requires readings from at least 5 transmitters. The simpler mode points to the nearest location from the signal, so check which mode works in this place.

Want to organise the tracker pool in your warehouse?

We will help set up the charger locations and the battery threshold. Book a conversation with the InnerWeb team.

Let's talk