Injection machine service lasting several shifts: best practices

A hydraulic system overhaul or a mould rebuild often takes longer than eight hours. Then the shift ends, but the work stays. The practices below rest on the principle that particularly dangerous work lives independently of the permit status and does not disappear at the end of a shift.

Why multi-shift service is difficult

In service that lasts several shifts, information about the state of the work is easily lost: the supervisor who approved the work finishes their duty, and the new supervisor sees only what has been written down. The greatest risk lies at the handover moment, when someone assumes that energy isolation is still in place, although nobody has confirmed it.

That is why the best practices rely on a state recorded in the system: particularly dangerous work has a state machine, and open tasks move between the phases of the permit without losing information.

Two independent modes: the permit and the dangerous work

Particularly dangerous work and the permit status are two independent modes. Unclosed particularly dangerous work does not block the permit from moving between phases, so the permit can pass from one phase to the next while the dangerous work remains visible as open.

Practice: the shift supervisor watches two indicators, not one. The permit status shows where the document is, and the status of the dangerous work shows whether the risk is still present.

Example service over three shifts: cumulative confirmed tasks

Example service over three shifts: cumulative confirmed tasksLine chart shows the cumulative number of confirmed tasks across three shifts.051015tasksShift 1Shift 2Shift 3Shift 1: 6 tasks6Shift 2: 11 tasks11Shift 3: 14 tasks14
Source: Illustrative example: 14 tasks in the service template, numbers chosen for the example

Tasks move to the main work

When the permit starts, the open tasks of particularly dangerous work move from preparation to main work, where they are confirmed by the contractor or the administrator. This way the next shift of technicians sees which tasks have already been done and which are waiting.

Good practice: confirm tasks as they are done, not all at once at the end of the shift. The record is then made at the moment of execution and is reliable evidence.

Handover and the audit trail

Changes to permits, the taxonomy of dangerous work and training results are recorded in the audit trail with the author and time. At handover, the incoming supervisor reads this record instead of relying only on conversation.

Keep a simple rule: no particularly dangerous work is left without an owner on the plant side. If the approving person leaves the shift, their successor confirms the takeover and sees the state of the work.

What to do when the shift ends and the work continues

Do not close the work for the convenience of the rota. The system does not allow particularly dangerous work to be closed while more than one employee remains on site, so closing follows from the state of the hall. If the work is to continue, the new shift of technicians picks it up from the recorded state.

InnerWeb is a software vendor and integrates with the plant's existing systems, so these practices do not depend on the type of injection machine.

Checklist

Video

Frequently asked questions

Does the permit status suspend the dangerous work?

No. They are two independent modes: unclosed particularly dangerous work does not block the permit from moving between phases.

Who confirms the tasks in the main work?

The contractor or the administrator confirms them, and the confirmation goes to the record with the author and time.

Can the work be closed at the end of the shift?

Only when no more than one employee remains on site. The system enforces this rule.