Volumes of flat objects: truck scale, yard and rail tracks

A car park, a truck scale, a storage yard and the sidings of a rail spur have no walls or roof, so they are easy to leave out of the plant structure. Yet this is where work at height and hot work take place, and where external companies come and go. Below are practices for describing such objects so that they appear on the map and can have lines and locations.

1 m
usual height of a flat object volume
Source: implementation card
4
types of flat objects: car park, scale, yard, tracks
Source: implementation card

Problem: a flat object without a volume does not exist on the map

The structure model is based on buildings as areas with an outline and a height. A flat object, that is a car park, a scale, a yard or tracks, was usually recorded in the old register as a point or not at all. Without its own volume no line can be created in it, and without a line there is no location to choose in a permit.

The consequence is practical: a contractor repairing the truck scale has to choose the Plant site or the nearest hall. The permit points to a place that does not match reality, and the accepting person does not see its context.

Practice 1: an own 1 m volume

Flat objects should get their own volume, usually 1 m high, and only then lines within it. The 1 m height is a convention: it is enough for the object to be visible on the isometric map and selectable, without pretending to be a building with a roof.

The outline of the volume is drawn to the real reach: for the scale it is the approach and the platform, for the yard the storage area, for the tracks a strip with a margin for maintenance work. It is not worth exaggerating it, because it overlaps neighbouring objects.

  • Car park: 1 m volume and lines by sectors.
  • Truck scale: volume with the approach and platform, a line for the cabin and one for the mechanics.
  • Yard: volume of the storage area, lines by bays.
  • Tracks: volume of the track strip, lines by sections.

Example: number of lines in flat objects

Example: number of lines in flat objectsChart: car park 4 lines, truck scale 2, storage yard 6 and tracks 3 lines.0246linesCar parkCar park: 4 lines4Truck scaleTruck scale: 2 lines2Storage yardStorage yard: 6 lines6TracksTracks: 3 lines3
Source: Example calculation based on the assumptions of this page: division into lines for four objects.

Practice 2: disjoint lines inside the outline

A line without its own shape does not inherit the outline of the whole building, but gets a disjoint area from the division of the building, so that lines do not lie on top of each other. The same rule applies to flat objects: tracks divided into sections are disjoint areas, not three overlapping rectangles.

Child objects of a building live inside the outline reduced by 1 m (the thickness of the wall). A flat object has no wall, but it is worth keeping this margin in mind when drawing, so that lines do not fall outside the volume after clipping.

Practice 3: objects without position have no volume

When no source knows the position of a flat object, we do not invent a volume. The object goes to the Plant site area without geometry and without a point, and it receives a volume when someone measures or indicates the place. Drawing a volume by eye creates exactly the error the map is supposed to prevent.

For plants with a large site it is best to start with the objects where external companies work: the scale, the rail spur, the raw material yard. That is where permits appear most often, so accuracy of the address pays off the most.

Practice 4: verification after drawing

After creating the volumes, check three things on the map: whether the volume is visible over the right orthophoto background, whether the lines lie inside and do not overlap, and whether the locations can be selected in the permit form. For the last point, a trial permit in the test environment is enough.

Also set up automatic gates: overlapping lines, pins outside the line, duplicates. Each has a red test, so that a green result means something.

Example calculation

Example of dividing flat objects into lines

Assumptions
ParameterValue
Car park4 lines
Truck scale2 lines
Storage yard6 lines
Tracks3 lines

Result: 15 lines in four volumes.

Note: Example calculation; the figures are assumptions for your own planning, not data from a specific plant.

Checklist

Video

Frequently asked questions

Why does a flat object need a volume?

Without a volume no line can be created in it, and without a line there is no location to choose. A 1 m volume is enough for the object to be visible on the map.

Can the truck scale be a single location?

It can, but it is better to split it into lines, for example the operator's cabin and the platform mechanics. The permit then points to a more precise place of work.

What should be done with tracks of unknown route?

Place them in the Plant site area without geometry, and add a volume only after the route has been measured or indicated.

What flat objects does your plant have?

Send us the list of the scale, yards and tracks, and we will prepare a plan of volumes, lines and locations with verification on the map.