InnerWeb
Skip to main content

Personal locator monthly maintenance cost

Maintaining a personal locator costs about 30 PLN net per month per unit in the sample offer. The logistics manager should add this amount to every device in the pool, including the idle ones. Below are the components of the rate, a calculation for 40 units and ways to lower the cost per issue.

30 PLN
monthly service cost per locator, net
Source: karta
1,440 PLN
service cost of one locator over 4 years
Source: sample calculation

What cost to add for one personal locator

A personal locator issued to drivers, visitors or external contractors generates a fixed service cost, whether or not it is in use at a given moment. In the sample offer, maintaining a locator costs about 30 PLN net per unit per month. The logistics manager should add this amount to every locator in the pool, not only to those issued on a given day.

The amount is an indicative range from 2025-2026 deployments, and an individual quote depends on the number of units and the scope of the service. For budget planning, 30 PLN per month gives 360 PLN per year and 1,440 PLN over 4 years per locator.

What is included in the 30 PLN per month

The rate covers four components: the SIM card, the device management system, battery replacement and spare cases. Each of them has a different nature. The SIM card is a recurring cost that exists as long as the device is active. The device management system makes it possible to check the version, status and settings remotely. The battery wears out over time and with the number of charging cycles. Cases get damaged, especially when devices are handed to people who are not used to them.

A good practice is to ask the supplier which of these components are in the fixed rate and which are billed separately after an event. For locators issued to visitors, the rate of damage is higher than for devices assigned to employees, so a stock of cases matters more.

Service cost per locator issue

Service cost per locator issueBar chart: the cost per issue falls from 12 PLN to 3 PLN as the number of issues grows.02.557.51012.5PLN net100 issues per month: 12 PLN net12100 issues per month200 issues per month: 6 PLN net6200 issues per month400 issues per month: 3 PLN net3400 issues per month
Source: Sample calculation: pool of 40 locators at 30 PLN each, that is 1,200 PLN per month, divided by the number of issues

Calculation for a pool of 40 locators

Example: a pool of 40 locators for drivers and visitors. The service cost is 40 times 30 PLN, that is 1,200 PLN net per month, 14,400 PLN per year and 57,600 PLN over 4 years. If the pool is served by two shifts, the cost does not rise, because the rate applies to the unit, not to the number of issues.

The actual cost per issue depends on the intensity of use. At 400 issues per month, the service cost per issue is 3 PLN net (1,200 PLN divided by 400). At 100 issues per month it is 12 PLN. This shows that utilisation of the pool matters: a pool that is too large raises the unit cost per issue, and one that is too small creates queues at the gate.

The figures in this calculation are illustrative and based on the rate from the sample offer. The number of locators and issues must be set on the basis of the actual traffic at the plant.

How to lower the cost per issue

There are three levers. The first is sizing the pool to the peak of traffic, not to the average: an oversized pool pays for idle devices. The second is fast circulation: a locator comes back, is connected to the multi-charger and is ready for the next issue, which shortens idle time. The third is limiting damage: a short briefing at issue and a case matched to the conditions reduce the number of service events.

With multi-chargers, knowledge of the charging state is important. Locators rarely report their real charging status, and the system infers it from the battery trend at the multi-charger location. This makes it possible to mark devices that are charging and ready in the pool view, without any extra load.

What is not in the locator rate

The service rate does not cover the purchase of the device, the server or licences, nor costs on the client side: the time of the person issuing the locators, recovery of lost units or penalties for devices not returned. These items must be priced in the issuing policy. It is worth deciding who bears the cost of a lost locator: the plant, the transport company or the visitor.

When comparing offers, ask the same questions: what is in the monthly rate, who replaces the battery and the case, and how a lost device is calculated. The answers to these three questions allow offers to be compared on a common basis.

Example calculation

Pool of 40 locators

Assumptions
ParameterValue
Locator service cost30 PLN net/month
Number of locators40 pcs
Period48 months

Result: 1,200 PLN net per month, 14,400 PLN per year and 57,600 PLN over 4 years for the whole pool.

Note: Sample calculation on the rate from the sample offer; indicative ranges from 2025-2026 deployments; individual quote.

Video

Frequently asked questions

What does the 30 PLN per month cover?

The SIM card, the device management system, battery replacement and spare cases.

Do you pay only for the locators that are issued?

No. The rate applies to each unit in the pool, regardless of the number of issues.

How can the cost per issue be lowered?

Size the pool to the traffic peak, keep fast circulation through the multi-charger and limit damage.

Who bears the cost of a lost locator?

The plant's issuing policy decides. The service rate does not cover it.

Let us plan the locator pool

We will match the size of the pool to the traffic at your plant and present a sample quote.

Let's talk