The situation: a large site, Ex zones and no reliable GPS
The petrochemical operation described here sits in a refinery covering about 531 ha, with a complex measuring roughly 5.4 by 3.2 km. The inquiry was prepared by the production operational safety department. The installation has explosive atmosphere zones, pipelines, tanks and process buildings, and GPS coverage there is limited. The operator therefore could not tell exactly where a worker was, or where the hazard was.
The plant runs Ex-rated phones with Android 9 or 11 and Bluetooth 4.2, plus gas detectors with Bluetooth. Replacing the equipment of the whole workforce was out of the question. The department asked about device certificates, the positioning method, evacuation and integration with existing systems.
The questions the plant asked
The inquiry boiled down to five questions, which most Seveso-category plants ask in a similar form.
- How do we establish a person's position in an Ex zone when GPS does not work?
- Will you use our Ex phones and detectors, or must we buy new equipment?
- What certificates do the beacons hold and which zones are they approved for?
- Is the list of people on site usable for evacuation?
- Does the system integrate with our permit, qualification and training systems?
Position error in the simulation (beacons every 100 m)
The solution: ATEX beacons and an Ex phone as the receiver
BLE (iBeacon) transmitters in ATEX design, approved for zones 2 and 22, are placed across the installation. The worker's Ex phone acts as receiver and relay: it hears several beacons at once, records the signal strength of each and sends the data over the cellular network or Wi-Fi every few seconds. The position is averaged on the map from many beacons. The "strongest wins" rule does not apply.
The beacons are mounted on poles and structures with cable ties or adhesive, with no cables and no mains power. They run for several years on industrial batteries across a temperature range from -40 to 60 °C. As a result, installation requires no hot work and no intervention in the zone's electrical installation.
Placement: about every 100 m, denser inside buildings
On site roads a spacing of about 100 m was adopted, matched to vehicle traffic on the plant grounds. Inside buildings the density rises to 1 beacon per 100–200 m2, which makes it possible to recognise the floor. The illustrative sample for the road part of the installation counted 106 ATEX beacons.
Such a layout is a compromise between cost and accuracy. A denser grid improves the result but increases the number of units to install and service. That is why the concept is shown on the real geometry of the customer's site rather than on a generic diagram.
Simulation result: 15 m on average, 39 m at most
A positioning simulation was run for the described grid of beacons every 100 m. The average error was 15 m and the maximum 39 m. This is an estimate from a concept document, not a post-installation measurement. On a large site, where what matters is which sector of the installation a person is in, this order of magnitude is useful: it lets a rescue team be sent to the right stretch of road or building.
To identify a specific room or floor, a denser grid inside the building and calibration after installation are needed. This is not promised in advance, but confirmed by measurement.
Alarms and the evacuation list
The phone app detects SOS, lack of movement and a fall, and the alarm reaches the dispatcher with the last known location. The dispatcher's map shows the people on site, and the evacuation list refreshes every dozen or so seconds and can be printed for the incident commander. The list shows who is in the zone and where they were last seen.
The system does not plan an evacuation route or an assembly point, because that is not its function. It provides evidence for audits and supports meeting the requirements on knowing how many people are present in a zone.
Conclusions and deployment conditions
The key lesson: there is no need to replace phones and detectors, it is enough to add beacons and an app. There are three practical conditions. App operation on a specific Ex phone model must be confirmed on the customer's device. For zones 1 and 21, certification is commissioned for the customer's installation, with no promised date. Integrating gas readings from detectors depends on the detector manufacturer's protocol and is a topic for a meeting, not a standard.
The system works as an independent overlay that complements and tightens the plant's existing permit and training systems. The plant chooses where it runs: its own server or the cloud. The data stays with the customer.
Video
Frequently asked questions
Do we have to replace our Ex phones?
No. The worker's Ex phone acts as the receiver. App operation on a specific model is confirmed on the customer's device.
Which zones are the beacons approved for?
InnerWeb beacons come in an ATEX design for zones 2 and 22. For zones 1 and 21, certification is commissioned for the customer's installation, with no promised date.
Does the system plan the evacuation route?
No. It shows the list of people in the zone and their last known position, with a printout for the incident commander.
Will gas detector readings reach the system?
That depends on the detector manufacturer's protocol and is a topic for the deployment meeting, not a standard feature.