Visitor labels printed by the office and evidence for a BRCGS audit

At a packaging plant visitors do not always stand at the reception desk. Some are booked by phone or email, and the office prints their labels in advance. If the system required a tick for the statement at that moment, it would create evidence of something nobody has signed. That is why the reception field is optional.

0
statement entries without a statement for a label printed by the office
Source: feature card

The problem: a label before the visit

The plant office prepares badges for visitors who arrive in an hour or tomorrow morning. Registration at reception creates an external account with an registration number and prints a QR badge in one step. At that moment the person the label is printed for has only been booked in a call or a message.

The first version of the form had a mandatory field confirming that the person had given the statement orally. The office would have had to tick it to print the label, even though the guest had not arrived yet. This would create a statement entry without a statement, exactly the kind of evidence an auditor can challenge with one question.

The solution: an optional field

At reception the field "the person gave the oral statement" is optional. Without a tick, the account and the badge are created, but no statement entry is created. The statement will be collected by the gate when the guest actually stands in front of the station.

The rule is simple to explain to an auditor: a statement entry exists only if someone actually gave the statement, and it always carries the channel and the confirmation time. A missing entry is not a gap in the log, but an interim state between the guest's booking and their entry.

Sample split of 30 visitors a day by registration route

Sample split of 30 visitors a day by registration routeBars show a sample split of visitors across three registration routes051015peopleIn person at reception: 12 people12 peopleIn person at receptionLabel from the office: 14 people14 peopleLabel from the officeDrivers at the gate: 4 people4 peopleDrivers at the gate
Source: Sample calculation: an assumed split of 30 visitors a day, no data from a specific plant

What the auditor sees in the log

The database stores one entry per person per day. It holds the submission channel, the confirmation time and the SHA-256 hash of the text shown to the person. An auditor who picks a random guest from the visit list can trace the path: invitation, registration, badge, statement, entry.

A guest with a label but no statement entry who appears in the entry log would be a sign of a process error. That is why, with the option on, the system does not save an entry without today's statement. The control sits in the system, not in the memory of the guard.

  • a label printed by the office does not create evidence of a statement
  • evidence is created at the gate, at reception or through one of the other five channels
  • an entry without today's statement is not saved
  • the statement entry stores a SHA-256 hash of the text

Oral statement at reception: when to tick the box

The box should be ticked only when the receptionist has the guest in front of them and has actually asked the questions from the statement. Then the entry is created at once, with the channel "reception", and the gate does not have to collect the statement a second time on the same day.

It is worth writing one sentence into the office instructions: for a guest the receptionist has not seen in person, the box is always left unticked. This single rule protects the log from entries nobody could defend.

The limits of the evidence

InnerWeb does not own the BRCGS standard and does not certify plants. The system provides the log and the trace, and the assessment of compliance belongs to the certification body. The hygiene requirements of the standard cover visitors and contractors too, so the plant should decide how it demonstrates control over both groups.

A good practice before an audit is a trial walk-through: pick three guests from the last week, find their entries and check that each has a channel, a time and a hash of the text.

Video

Frequently asked questions

Can a visitor enter the site without ticking the box?

No, if the statement option is on: a visitor without today's statement does not enter, and the gate collects the statement.

Why is the field not mandatory?

The office prints labels for visitors booked by phone or email who are not standing at reception. A mandatory field would create evidence of a statement nobody gave.

Is the badge created without a statement?

Yes. The external account with a registration number and the QR badge are created in one step, and the statement entry separately.

Sources