Starting point: paper at the security post
The plant receives drivers, service technicians, customer auditors and visitors from the head office every day. The BRCGS standard for packaging requires control of personnel health, and the hygiene requirements also cover visitors and contractors. Until now the plant handled this with a paper form signed at the security post.
The paper had three weak points. The form was easy to sign for someone else or to sign a day early. Searching the binder before an audit took hours. There was also no trace of which version of the statement applied on a given day, once someone changed the template in a text editor.
What the plant switched on in the system
The health statement in InnerWeb is an option that the plant turns on in its settings. It is off by default, so other installations keep working as before. The plant switched the option on after preparing the statement text in the admin panel.
With the option on, a visitor without today's statement does not enter the site, and the entry itself is not saved in the log. This is what sets the solution apart from paper: a missing statement blocks the passage, instead of leaving a gap in a binder.
- the statement is valid for one calendar day in the Europe/Warsaw time zone
- one entry per person per day: submission channel, confirmation time, SHA-256 hash of the text
- internal employees are exempt, because the document applies to visitors and external companies
- a person already on site can always leave
Security post time for 40 visitors a day
- Paper
- Digital gate
How a visitor enters
The visitor receives an invitation from an employee, registers on a phone and shows a QR code or a badge at the gate. If the visitor has not submitted the statement that day, they sign it at the gate station. The station displays the text in the language of the person's account, and after the card or badge is read, the interface switches to the language of the holder.
The security staff no longer judge whether the paper is fresh. The system returns the reason for refusal in a fixed order: inactive account, missing health statement, missing training, missing qualifications, expired permit, no permit or visit. Thanks to the fixed order, the guard hears the same message for the same situation every time.
Change in the work of the security post
The security post stops being an archive. Instead of collecting and sorting paper, the guards handle exceptions: a visitor without a phone, a visitor who refuses the statement, a person with an inactive account. Exceptions are visible in the panel, and a refusal at the gate does not create an entry.
For the quality manager the evidence changes. Instead of a binder there is a log in which each day and each person has one entry with a hash of the text. The SHA-256 hash shows which wording was used, and a later change of the text does not rewrite the history. This provides evidence for an audit, but the assessment of compliance belongs to the certification body, not to InnerWeb.
Sample calculation: time at the security post
The calculation below is an example. It is based on the assumptions in the box and is not a measurement from a specific plant. It shows how to count the time the security post spends on paper before the plant makes a decision.
Conclusions from the rollout
The most important change concerns the quality of the evidence, not speed: the statement is linked to a person, a day, a channel and a version of the text. The second conclusion concerns the role of the setting: because the option is off by default, the plant switched it on only after preparing the text and training the guards, with no effect on other entry processes.
The third conclusion concerns the limits of the system. InnerWeb does not own the BRCGS standard and does not certify plants. It provides the log and the trace, and the auditor makes the decision on compliance.
Security post time with 40 visitors a day
| Parameter | Value |
|---|---|
| Visitors per day | 40 people |
| Signing a paper form | 2 min per person |
| Archiving paper | 1 min per person |
| Statement at the gate | 40 s per person |
Result: Paper: 120 min a day. Digital gate: approx. 27 min a day.
Note: Sample calculation based on the assumptions above; the result in a specific plant depends on the number of visitors and how the security post is organised.
Video
Frequently asked questions
Does the statement apply to the plant's employees?
No. Internal employees and accounts without a company are exempt, because the document applies to visitors and external companies.
Can a visitor leave without a statement?
Yes. The statement applies only to entry. A person already on site can always leave, so they do not remain on the evacuation list until the automatic night exit.
Does the system certify the plant against BRCGS?
No. InnerWeb provides the log and the evidence for an audit, and the assessment of compliance belongs to the certification body.
Sources
Let's talk about the gate in your plant
We will show how to turn on the health statement with a plant setting and what the security staff will see at the gate.
Let's talk