Starting situation
We describe a chemical plant that runs refining and petrochemicals as part of an international group. It is an essential entity under NIS2, and in maintenance it works with about 20 external companies. Every month it admits several dozen people from outside its own workforce to work, including hot work, work at height and work in tanks. The case is generic: the scale and profile come from implementation experience, without names or identifying details.
Permits lived in binders. There was no current picture of open work, and whether anyone was still inside a tank was known only to those standing at the entrance. Initial training took place at the gate and delayed the start of work. The validity of qualifications (electrical, supervisory, work at height) was tracked by hand. On paper, the order of safeguards, measurements and signatures depended on discipline.
Problem: tank cleaning with several companies involved
Tank cleaning usually involves several crews: one for emptying and isolation, a second for cleaning, a third for scaffolding or work at height at the manhole, sometimes a fourth for inspection after cleaning. Each has its own foreman and its own documents. The authorising person must check the qualifications of every individual, the consistency of dates and that an atmosphere measurement was taken before entry.
On paper this means many signatures and retyping the same data. The plant reported three specific difficulties: no certainty that every person in the crew, not only the foreman, had completed training; the risk of closing a permit while someone was still in the tank; and no easy compilation of evidence for the corporate audit and the insurer.
Permit issue and closure time (example calculation)
- Paper
- Electronic system
Solution: one path of training, permit and control
The plant introduced a single path. An employee of an external company receives a named invitation with a QR code, completes online training with a test in two language versions, and the register of companies and qualifications watches expiry dates. A person without current training will not be admitted. This way training is not a bottleneck at the gate in the morning.
A work permit is an electronic document that moves through preparation, main work and closure phases. The system checks the dates and the qualifications of assigned workers. Work in confined spaces has its own safeguard lists, and admission matrices link the type of work with the required qualifications and define who can issue a permit and who can approve it. Approval or rejection of especially hazardous work belongs to a user on the plant's side, not to the contractor. In the field, a QR code check shows training, qualifications and the permit for today.
The implementation deliberately covered training and permits, without locating people: no beacons, wristbands or position tracking. The plant can add location later on the same instance.
How tank entry runs after implementation
An example working day looks as follows. The coordinator of the external company announces the crew, the system shows gaps in training and qualifications, and the authorising person sees them before the crew arrives. A permit is created within seconds from ready templates, specifying the tank, the time window and the risks. After the atmosphere measurement and the briefing, the especially hazardous work is approved by a person on the plant's side.
- A named training invitation before arrival, with a test and a declaration in two languages.
- The admission matrix checks whether the person may perform this type of work.
- A permit with a safeguard list for a confined space and risks assigned to the location.
- Approval of the work by a plant user, not by the contractor.
- QR check in the field and a live view of who is doing what work, and where.
- The permit can be closed only when no more than one person remains on site.
Effect: permit issue time (example calculation)
Example calculation under these assumptions: tank cleaning requires 3 permits per stage (emptying, cleaning, inspection), 6 such tanks are handled per month, which makes 18 permits. Issuing on paper takes 40 minutes (a walk-round, retyping data, signatures), in the system 12 minutes. Closing takes 20 and 8 minutes respectively. We assume the combined hourly cost of the people involved at PLN 95.
The saving per permit is 40 minutes. At 18 permits this gives 12 hours per month, or about PLN 1,140 per month from tanks alone. This is a cautious estimate: it does not count incidents avoided or training time at the gate. The value is not only time but an orderly record of who entered the tank, when and on what basis.
Conclusions for similar plants
First, a path from training to field control works better than isolated improvements, because it seals the whole sequence. Second, launch took about 6 weeks, and no infrastructure on the customer's side was needed. Third, employees of external companies are not counted as users and generate no licence costs, regardless of how many are trained.
For plants subject to NIS2 or the KSC Act, such a solution is part of the organisational framework around work in critical zones, and the event record supports meeting the requirement and provides evidence for an audit. It does not replace the works manager or the authorising person.
Permit cycle time for tank cleaning
| Parameter | Value |
|---|---|
| Tanks cleaned per month | 6 pcs |
| Permits per tank (3 stages) | 3 pcs |
| Issue and closure on paper | 60 min |
| Issue and closure in the system | 20 min |
| Combined hourly cost of the people involved | 95 PLN/h |
Result: 18 permits x 40 min = 12 h per month, or about PLN 1,140 per month.
Note: Example calculation based on explicit assumptions, not a measurement at a specific plant.
Video
Frequently asked questions
Do employees of external companies generate licence costs?
Not in the model described. The licence covers people on the plant's side and company coordinators, while contractor employees and guests are not counted as users.
Does the implementation require locating people in the tank?
No. The case covers training, permits and QR control. Location can be added later on the same instance.
Who approves tank entry?
A user on the plant's side. A contractor cannot approve or reject especially hazardous work.
Does the system replace the authorising person?
No. It enforces the sequence, checks dates and qualifications and keeps a record, but decisions are made by people.