What the manual evidence cost is made of
The cost of manual entry evidence is not the cost of the notebook but the cost of time. The officer or security specialist collects entries from the book at the door, looks for missing signatures, fills in the reason for the visit from correspondence with the service company and copies everything into a summary for the auditor. Every entry requires several actions, not one.
The time grows with the number of companies servicing the server room, because each has its own visit rhythm and its own order documents. The example calculation assumes four service companies and six visits a month per company. This gives 24 entries a month and 288 entries a year, each of which has to be linked with a reason in the log.
- Collecting entries from the book or photos
- Completing the missing data about the entry
- Linking the entry with an order or a permit
- Copying everything into the summary for the auditor
Example calculation: 288 entries and 72 hours
Assuming 15 minutes per entry, a manual summary of the log for 288 entries a year is 72 hours of work, roughly 9 working days of 8 hours. For one server room this is a manageable number, but in a plant with several critical rooms it adds up to weeks of work for a specialist who also has other duties.
The cost is not even over the year. The most time goes on the period just before the audit, when all the summaries are needed at once. This is the moment when the specialist puts aside current tasks, and the risk of error grows, because the entries are assembled from memory and from documents scattered across several places.
Server room entries: monthly and yearly
What saving the entry at every scan changes
When every scan at the security screen is an audit act and is written to the entry and exit log, the summary for the auditor is an export, not a project. A scan of a QR badge or an RFID card gives a verdict that takes into account valid trainings, qualifications, a permit in progress and an active account. The specialist's work shifts from copying to checking exceptions.
If the server room door is served by the client's access control system, InnerWeb receives card read events through a webhook and links them with qualifications, permits, attendance and working time records. It does not produce or replace readers. The installation can run in the client's server room as an independent system that complements existing systems, so the data stays within the organization.
The saving does not equal the full 72 hours, because exceptions and reasons still require a human. It is honest to state that the system reduces the time needed to assemble the summary, but does not remove the decision on whether an entry was justified.
Periodic report instead of a summary at the last moment
Periodic report rules send an e-mail daily, weekly or monthly with tables and a PDF attachment carrying the client's logo, and optionally an XLSX file. Each rule has a separate scope of locations and recipients, so the summary of server room entries can go to the officer every month and to the board every quarter as a separate rule.
Such a rhythm spreads the work evenly. Instead of nine days before the audit, the specialist reviews a short summary every month and clarifies entries without a reason straight away, while people still remember what the visit was about.
Time of manual log assembly per year
What this calculation does not cover
The calculation counts only the hours of assembling the log. It does not include the cost of supervising the service technician or the cost of permits, which we describe separately. It also does not include the price of the implementation: the quote is individual and depends on the number of locations, the integration with the existing access control system and the installation mode.
The assumptions can be changed. If the plant has six service companies or the entries are more frequent, the number of entries grows proportionally, and so do the hours. The formula is simple: number of companies times entries a month times twelve times the time per entry.
Manual assembly of the server room entry log
| Parameter | Value |
|---|---|
| Number of service companies | 4 companies |
| Entries per company | 6 entries/month |
| Time per entry | 15 minutes |
| Hours in a working day | 8 hours |
Result: 288 entries a year, 72 hours of work, roughly 9 working days of 8 hours
Note: Example calculation based on the assumptions above. It does not include the cost of implementation, supervision of the service technician or permits; the quote is individual.
Video
Frequently asked questions
Where does the 15 minutes per entry come from?
It is an assumption of the example calculation: collecting the entry, completing the reason for the visit, linking it with the order and copying it. In a specific plant the time should be measured on several entries.
Does the system remove all the work on the log?
No. It removes the copying. Exceptions, missing reasons and entries outside the time window are still assessed by a human.
Does the access control system have to be replaced?
No. InnerWeb does not replace readers. It receives card read events from the client's system and links them with permits, qualifications and attendance.
Let us calculate this for your server room
We will recalculate the example for the number of companies and entries in your plant and show the log saved at the scan. Arrange a conversation with the InnerWeb team.