Cost of external service work in the server room: supervision, permits and log

A purchasing manager assessing a service contract at the plant usually sees the rate of the external company and overlooks the costs on the client side. Entering the server room means an employee's supervision, a permit, trainings and an entry in the log. Below we break this cost into its components and show an example calculation based on 288 entries a year.

288
entries a year in the example
Source: example calculation
744 h
of client work a year in the example
Source: example calculation

Visible and hidden costs in the service contract

The cost of external service work in the server room consists of a part visible in the offer and a part borne by the client. The visible part is the rate for the visit or the subscription. The hidden part includes the time of the employee who accompanies the service technician, the time to issue and close the permit, the time to check the company's trainings and the time spent on the entry in the log.

When assessing the contract the question is therefore not only how much a visit costs, but how many hours of the client's own staff it absorbs. For a server room served by four companies with six visits a month per company, the number of entries is 24 a month, or 288 a year. Every entry carries all of the hidden costs listed above.

  • Supervision of the service technician by a plant employee
  • Issuing and closing the work permit
  • Verifying the trainings and qualifications of the external company
  • Entry in the log and linking it with the reason

Supervision: a cost that grows with the number of entries

A visit to the server room has a supervisor if the access policy requires it. In InnerWeb a planned visit has a supervisor, and the system calls the supervisor once, at the first entry. At the gate, a planned visit replaces the one-day permit requirement, but trainings, qualifications and an active account still decide on entry.

For the example calculation we assume that supervision takes 2 hours of an employee's time per entry. For 288 entries this gives 576 hours a year. This assumption is a hypothesis to be measured, not a measured result: at a plant where the technician performs a short inspection the time will be shorter, and when a component is replaced it will be longer.

Hours on the client side: structure of the cost

Hours on the client side: structure of the costDonut chart: 576 hours of supervision, 96 hours of permits and 72 hours of the entry log a year.Supervision of the technician: 576 hours (77.4%)Permits: 96 hours (12.9%)Entry log: 72 hours (9.7%)744hoursSupervision of the technician576 hours (77.4%)Permits96 hours (12.9%)Entry log72 hours (9.7%)
Source: Example calculation based on the assumptions in the Calculation section

Permit: who issues it and how long it takes

The electronic work permit defines the task, the place and the time window of the contractor's work and passes through the preparation, main work and closing phases. The flow of permits issued to an external company lets the issuer on the plant side and the contractor work on the same permit, and the assigned work is visible on the company's screen.

In cost terms this has two effects. First, the contractor fills in part of the document, so the time of the issuer falls. Second, the closing is saved with a time stamp, which later allows checking whether the actual working time matched the window in the permit. For the purchasing manager this is data for a conversation with the supplier about the real time of presence in the server room.

In the example calculation we assume 20 minutes of work on the plant side per permit. For 288 entries this gives 96 hours a year.

Log and trail: a cost that can be measured

The third part is evidence. Assembling the entry log for the audit by hand from paper books, assuming 15 minutes per entry for 288 entries a year, comes to 72 hours of work, roughly 9 working days of 8 hours. When every scan at the security screen is saved in the entry and exit log, this cost turns into an export and a check of exceptions.

Periodic reports complete the picture: a separate rule can send the purchasing manager a monthly summary of entries of a specific company, which makes the conversation about the consistency of invoices with the actual state easier.

Total of costs on the client side

Adding up the example assumptions gives per year: 576 hours of supervision, 96 hours for permits and 72 hours for the log, 744 hours in total, or 93 working days of 8 hours. The number is not a forecast for a specific plant, but an illustration of the order of magnitude that is easy to overlook when the contract shows only the rate of the technician.

Before the purchasing decision it is worth measuring your own values on a sample of several visits, and then recalculating with the real number of companies and entries. The quote for the implementation is individual and depends on the number of locations, the integration with the existing access control system and the installation mode. InnerWeb does not replace readers: it receives card read events from the client's system and links them with permits, qualifications and attendance.

Example calculation

Cost of client time for 288 service entries a year

Assumptions
ParameterValue
Service companies4 companies
Entries per company6 entries/month
Supervision per entry2 hours
Permit on the plant side20 minutes per entry
Manual log entry15 minutes per entry

Result: 576 h of supervision + 96 h of permits + 72 h of log = 744 hours a year, approx. 93 working days of 8 hours

Note: Example calculation. Supervision and permit time are assumptions to be measured at the plant. It does not include the rate of the service company or the price of the implementation; the quote is individual.

Video

Frequently asked questions

Are 2 hours of supervision per entry a realistic number?

It is an example assumption. With a short inspection the time will be shorter, and with a component replacement longer. For your own calculation, measure several visits.

Does the system reduce the supervision time?

It does not replace the supervisor where the policy requires one. It shortens the paperwork for permits and the log, and the supervisor receives the information about the entry from the system.

Does the contractor have to have access to the system?

In the flow of permits issued to an external company, the contractor works on the same permit as the issuer, and the assigned work is visible on the company's screen.

Calculate the service cost at your plant

We will recalculate the assumptions for the number of companies and entries in your server room and show the permit flow for an external company. Arrange a conversation with the InnerWeb team.