Situation: a customer group at print acceptance
A production manager at a packaging printer learns that a group of customer representatives will come to accept an order: the quality department, purchasing and someone from logistics. The acceptance takes place at the machine, so the visitors will enter the hall where packaging for the food industry is produced. The site follows hygiene requirements, and for such sites the BRCGS standard expects a visitor to make a health declaration before being admitted.
In practice, someone from security or reception collects signatures on paper, someone else writes badges by hand, and the production manager waits in the corridor with the whole group. With four or five people this takes a dozen minutes or so, during which the machine stands without a decision-maker supervising it. The scenario below shows how to move these steps into the system, so that nothing is left at the gate except scanning a badge.
Invitation and registration before arrival
The host, that is the visitor coordinator on the printer's side, sends group invitations. The system limits them to 5 sends per 13 minutes per user, which protects against flooding inboxes by accident, and for a group from one company a single send is usually enough. Visitors register by phone, scanning the QR code from the invitation or from a poster, and the account language chosen during registration decides the language of the training and the wording of the declaration.
If someone from the group has not managed to register, reception creates the account in a single step: an external account, a registration number and a printed QR badge. The fields have limits (first name up to 20 characters, last name up to 30, note up to 64), so long surnames and company names must be shortened deliberately, not only when printing.
Limits of guest registration fields
Health statement as a condition of entry
The health statement function is disabled by default, and the administrator turns it on in the site settings. This means a printer that has adopted the BRCGS requirement enables it, while other installations keep working unchanged. Once enabled, a visitor without today's declaration is not admitted, and no entry record is created in the system.
Validity is counted in calendar days in the Europe/Warsaw time zone. A declaration made yesterday at 23:59 is invalid today, while one made today at 00:01 is valid until midnight. This rule matters for visitors who arrive two days in a row: on the second day they make the declaration again. For each declaration the system stores a SHA-256 hash of the text shown, so an audit can prove what wording the visitor saw, even if the text was changed later.
The declaration can be made in several ways: at the gate station, at reception, orally in the security panel, during training on a phone or kiosk, or in the portal after registering from the QR poster. For a group the phone path works best, because everyone does it in parallel, already in the car park.
Badge and label printing order
The host can tick a label print field in the invitation. The secretariat receives a message with a Print button, which prints one or many labels on the label printer. For an acceptance group this means a set of badges ready at reception before the visitors enter the building. The secretariat address is a system setting, empty by default, so until it is filled in the function stays hidden. Setting it should be the first step of the implementation.
Reception also has a list called For QR code printing, which refreshes every 34 seconds and shows people with an account who have never had a label printed. It is a simple check that nobody from the group passes without a badge.
Effect for the production manager and scope limits
The production manager no longer fills in forms. Before arrival he or she sees who has registered and made the declaration, and at the gate the visitors scan their badges. People without a declaration do not enter, and their absence is visible immediately, not after an audit. For the quality department this is also evidence: the declaration has a date, a text version and a submission channel.
The limits are clear. The system does not replace the decision on who may enter the hall, and it does not produce readers or badges: it uses a label printer and the existing gate process. This is an implementation scenario, not a description of a specific installation, so times and visitor numbers should be treated as assumptions for your own calculation.
- Enable the declaration function in the site settings and check the wording of the text.
- Set the secretariat address for label print orders.
- Invite the group a day in advance, asking them to register by phone.
- On the day of acceptance, check the For QR code printing list at reception.
Video
Frequently asked questions
Does the declaration also apply to the printer's own employees?
No. The declaration concerns entry of visitors from external companies. A person who is already on site may always leave, so that they do not remain on the evacuation list.
What if a visitor has no phone?
Reception registers them at the station: an account, a registration number and a badge are created, and the declaration can be made orally in the security panel or at the gate.
Can the declaration text be in English?
Yes. The text can have a version in a second language, and a person whose account is in a language other than Polish reads the wording in their own language.
Let's talk about visitors at your print shop
During a demo we will show how group registration, the declaration and the QR badge work in a printing plant. Book a short conversation with the InnerWeb team.
Let's talk