Rolling stock depots of a rail operator: technical facility security and NIS2

A rail operator whose maintenance base consists of several inspection halls hosts dozens of contractor staff every month: service technicians, parts suppliers, cleaning companies and auditors. This generic case shows how to organise their access, work permits and location so as to build evidence for a NIS2 audit. The figures come from an illustrative calculation with explicit assumptions.

112
outside people per month (illustrative calculation)
Source: illustrative calculation
28
new people to train per month (illustrative calculation)
Source: illustrative calculation

Starting situation

The entity described is a rail operator running its rolling stock maintenance base in three inspection halls. One handles routine inspections, the second major repairs, the third washing and auxiliary work. The operator employs several hundred people at the base, so under the thresholds of the Polish National Cybersecurity System Act (KSC) it belongs to the group of entities that must assess their status. The base is not an isolated world: diagnostic stations connect to the corporate network, and power equipment and cranes are serviced by contractors.

The case is generic: it does not describe a specific company, and the figures in the calculation section follow from explicitly stated assumptions. Their purpose is to show the scale of the problem, not to report results from any installation.

The problem: access without a register

Before the rules were organised, contractor access looked like it does in many plants: work permits on paper or in spreadsheets, induction training recorded in separate registers, entry to the hall based on the gatekeeper knowing the person. As a result, when an event occurred, nobody could quickly say which contractor staff were in which hall and whether their training was current.

From the NIS2 perspective this is a gap in ICT supply chain security and access management. The 2025 OT trends card recommends a register of external and subcontractor access to OT zones and combining physical and logical access control to critical zones with evidence of who was in the zone and when. For a railway base this means a register that answers the auditor's question without searching binders.

Structure of outside people in a month (illustrative calculation)

Structure of outside people in a month (illustrative calculation)Donut chart: 28 new people and 84 known people out of 112 outside people in totalNew, need training: 28 people (25%)Known, training valid: 84 people (75%)112peopleNew, need training28 people (25%)Known, training valid84 people (75%)
Source: Illustrative calculation on the assumptions from the Calculation section

The solution: permits, QR gate and location

The operator deployed an independent system that supplements existing procedures, built on three elements that InnerWeb provides within one platform.

Electronic work permits

A work permit at the base is an electronic document that moves through preparation, main work and closure. When it is created and opened, the system checks the dates and the qualifications of the assigned workers. The plant has a live view of who is doing what work and where. An order placed with a contractor goes through the same flow, with a view of the ordered work on the contractor side.

QR gate and security panel

A contractor employee receives a badge with a random QR code that contains no personal data. A scan at the gate gives security an unambiguous verdict based on training, qualifications, permit and active account, and every scan goes to the entry and exit register. Scanning a person without valid training raises an alarm and notifies the coordinator at their company. A planned visit replaces the permit requirement for one day, but training and an active account still decide on entry.

Location in the halls

A worker's device periodically sends the BLE beacons it hears, signal strength and battery state, and the position results from the signals of many beacons. Location works without GPS, which matters inside inspection halls. The data feeds the view of people on site and can automatically add a worker to a permit once they enter the work area. The condition is that location is configured and beacons are installed: in a building, typically one beacon per 100–200 m2.

Illustrative calculation: how many outside people

To assess the scale, the assumptions described below were used. This is an illustrative calculation, not a measurement from any installation.

With three halls, 14 contractor companies a year and on average eight unique people from each company per month, the base serves about 112 outside people a month. With a 25% monthly turnover, about 28 people are new and need induction training and qualification checks. If security manually checks the documents of each of them for 6 minutes and of the remaining 84 people for 2 minutes, that is about 5.6 hours of work a month purely on checks at the gate. With an electronic verdict the time per person drops to a scan, and security no longer interprets the full permit.

The effect: evidence created in the course of work

The most important effect is evidential rather than a matter of time. After deployment the operator has an entry and exit register, a permit history, training results and an audit trail of changes: who changed a permit or a training result, and when. In an incident involving an inspection hall, the list of people present in the zone is produced in minutes, which speeds up preparing a report within the 24-hour and 72-hour windows.

Such records support meeting the supply chain security requirement, but they do not replace a risk policy or an asset analysis. The deadline for chapter 3 obligations of the Act is 3 April 2027, and the first audit of an essential entity and penalties fall from 3 April 2028, so the base has a window to build evidence.

Conclusions for a railway base

First, registering outside people is cheaper than repairing the consequences of a gap. Second, physical and logical control must meet in one record. Third, work in halls without coverage requires solutions resilient to loss of connectivity, so user actions are saved in an offline queue with protection against duplicates. Fourth, the installation can run on the operator's own server (on-premise) in an isolated instance with its own database.

Example calculation

Illustrative calculation: outside people at the rolling stock base

Assumptions
ParameterValue
Inspection halls3 halls
Contractor companies per year14 companies
Unique people per company per month8 people
Monthly turnover25 %
Manual check of a new person6 min
Manual check of a known person2 min

Result: 14 × 8 = 112 people per month, of whom 28 new (25%) and 84 known; manual check time: 28 × 6 + 84 × 2 = 336 min, or about 5.6 h per month.

Note: Illustrative calculation on generic assumptions; results at a specific site depend on the number of companies, turnover and configuration.

Video

Frequently asked questions

Does BLE location work in halls without GPS coverage?

Yes. Location is based on BLE beacons and does not require GPS. The position results from the signals of many beacons, and effectiveness depends on how the beacons are placed in the hall.

Does the system open the gate by itself?

No. The security panel shows a verdict based on training, qualifications, permit and account. The decision to admit a person is made by security.

Is such a deployment enough to meet NIS2?

Not on its own. The system provides audit evidence in the area of access and the supply chain, while other requirements, such as a risk policy or an incident procedure, need separate work.