Why a railway depot falls within the scope of NIS2
Transport is one of the sectors of high criticality under Directive (EU) 2022/2555, and rail transport is part of it. The Act of 23 January 2026 amending the National Cybersecurity System Act (KSC), published in Dz.U. 2026 item 252, covers medium and large entities from the critical sectors as well as medium and large entities from the important sectors. For a technical depot this means that the scope is not limited to running trains: the whole organisation counts, including rolling stock inspections, workshops, hall control systems, power supply for work bays and access for service contractors.
Figures from the CERT Polska report show the scale of the background. In 2025, 260,783 unique incidents were registered, 152% more than a year earlier. Among serious incidents handled by CSIRT NASK under the KSC Act, transport accounted for 5 of 27 reports. That is little compared with banking, but enough for the regulator to treat the sector as genuinely exposed.
Step 1: self-identification, or who you are under the Act
The Act shifts the burden to the entity. The company assesses on its own whether it is an essential or important entity and submits an electronic application for entry in the register kept by the Minister of Digital Affairs. A change to the entry must be reported within 14 days of the change. A sector regulator can also enter an entity by decision, so failing to report yourself does not protect you from being covered.
The thresholds on which the assessment rests are as follows:
- essential entity: a large entity in a critical sector, meaning 250 or more employees or turnover above EUR 50 million together with a balance sheet total above EUR 43 million, plus selected categories regardless of size
- important entity: a medium entity in a critical sector (50 to 249 employees, or turnover up to EUR 50 million, or a balance sheet total of EUR 10 to 43 million) and medium and large entities in the important sectors
- the deadline for submitting the application depends on the schedule in the Minister of Digital Affairs' notice for the given category of entity, so check that notice before starting work on documentation
Corporate groups and depot companies
A technical depot often operates as a separate company serving one or several operators. To assess size, you need to analyse capital and personal links, because the headcount threshold is calculated under the rules for linked enterprises. Put the result of that analysis in one document, dated and signed by the head of the entity: it is the first piece of evidence an auditor will ask for.
Unique incidents registered by CERT Polska
Step 2: what the Act requires you to have by 3 April 2027
Entities that met the criteria on the day the Act entered into force have 12 months to meet the obligations of Chapter 3. These include an information security management system, documentation and incident procedures. In railway depots, four elements are most often missing.
- a risk assessment policy that also covers OT systems: hall controllers, diagnostic stations, power equipment and access control systems
- an asset analysis, meaning a current register of devices, software and network connections
- ICT supply chain security, including a record of external companies and their access to technical zones
- staff training and the mandatory annual cybersecurity training for the head of the entity
Contact persons and management oversight
The entity designates at least two persons to liaise with bodies of the national cybersecurity system. The head of the entity is responsible for overseeing the information security management system, planning financial resources and assigning tasks. The Act also provides for a personal penalty for the head of an essential or important entity, of up to 300% of remuneration calculated like a holiday-leave equivalent, so the topic reaches board level.
Step 3: incidents and reporting at 24 h, 72 h and one month
A serious incident is reported through the S46 system to the competent CSIRT in three stages: an early warning without delay and no later than 24 hours after detection, an incident notification within 72 hours, and a final report within one month of the notification. This timeline requires a prepared procedure, because on a Saturday evening after an attack on a hall system nobody will be looking for the document for the first time.
For a railway depot it is worth settling three questions in advance. Who decides that an incident is serious? Who has an S46 account, and who is the deputy? Where do we get data on which halls and which vehicles were within the reach of the event? The last question concerns physical evidence: a list of outside persons present in the zone at a given time shortens the investigation.
Fines and timetable: what remains until 2028
The fines in the Act are high, but the transition period is long. An essential entity risks up to EUR 10 million or 2% of the previous financial year's revenue (whichever is higher), and not less than PLN 20,000. An important entity risks up to EUR 7 million or 1.4% of revenue, and not less than PLN 15,000. The most serious infringements, which create a direct threat to human life and health or serious property damage, can cost up to PLN 100 million.
Fines under Article 73(1) to (4) and Articles 73a to 73c can be imposed for the first time two years after entry into force, that is from 3 April 2028. The first cybersecurity audit of an essential entity falls on the same date, and then at least once every three years. A period without fines is not a period without risk: infringements from before that date can also be answered for, so 2026 to 2028 is the time to build evidence.
Audit evidence in a technical depot
An auditor does not ask about intentions, only about records. For a railway depot a good set of evidence is a few registers that arise in the course of work rather than being created for the inspection visit.
Part of the evidence concerns physical access to technical zones, which matters as much as logical access. The InnerWeb system works as an independent system that complements the existing permit and training systems: it records an electronic work permit with preparation, main work and closure phases, checks the qualifications of the assigned workers and keeps an audit trail of changes. A QR badge scan at the gate gives security staff a clear verdict based on training, qualifications, the permit and an active account, and every scan goes into the entry and exit register. Such records support meeting the supply chain requirement and provide evidence for an audit, but they do not replace the risk policy or the decision of the head of the entity.
- a register of OT and IT assets with an owner for each asset
- a risk assessment policy and protocol with an approval date
- a list of external companies with the scope of access and the validity date of their training
- a register of entries and exits to technical zones and work permits
- an incident reporting procedure for 24 h / 72 h / one month with contacts and deputies
- records of staff training and of the head of the entity's training
Video
Frequently asked questions
Does a railway operator's technical depot have to register separately?
It depends on the legal structure. If the depot is a separate company, it assesses its own size and sector independently, taking capital links into account. It is worth writing down the result of the assessment and having it approved by the head of the entity.
Does the period without fines until 2028 mean you can wait?
No. The Chapter 3 obligations must be met by 3 April 2027, and infringements before 3 April 2028 can be examined later. Building evidence in this window is cheaper than reconstructing it during an audit.
Does a permit and access control system guarantee NIS2 compliance?
No. No tool guarantees compliance. A system can support meeting supply chain requirements and provide records for an audit, while full compliance requires policies, procedures and decisions by the head of the entity.
By when must the application for entry in the register be submitted?
The deadline depends on the schedule in the Minister of Digital Affairs' notice for the given category of entity. Before planning the work, check that notice and assign a responsible person.
Sources
Let's talk about evidence for your depot
In a demo we will show how permits, training and QR gate control provide records for a NIS2 audit. Write to us or book a conversation with Marcin Worecki.
Let's talk