OHS risk editor: adding new hazards

A new assembly line brings hazards that the plant's catalogue does not yet know. The health and safety specialist adds them once in the risk editor, with a pictogram, protective measures and an assessment before and after, and from that moment they are available to everyone issuing permits. Below are good practices for adding them.

4
risk level thresholds: 20, 70, 200, 400
Source: karta
270 to 45
example level before and after measures
Source: kalkulacja przykładowa

When a hazard needs to be added

The risk catalogue goes out of date the moment a new line starts up, a technology changes, or an incident reveals a gap. That is when the health and safety specialist adds the hazard, instead of waiting for the people issuing permits to type it in by hand as user risks.

The risk editor lets the administrator and the health and safety role add a new hazard once, after which it is permanently available to everyone issuing permits. The consequence is practical: one well-described hazard replaces many manual entries of varying quality.

What the risk assessment looks like in the editor

In the risk editor you assess the probability, exposure and severity before and after the measures are applied, and the risk level is calculated as the product of these three values against the thresholds 20, 70, 200 and 400. The thresholds divide the result into levels, and these levels determine how strong the measures must be.

After protective measures are applied, exposure and severity usually stay the same, and only the probability drops. By default the editor copies these values from the initial assessment, so after the measures the specialist mainly changes the probability.

  • Probability of an event occurring.
  • Exposure, meaning how often and how long people are exposed.
  • Severity, meaning how serious the possible consequences are.
  • Risk level as the product of the three values, compared with the thresholds 20, 70, 200 and 400.

Example risk level before and after protective measures

Example risk level before and after protective measuresBefore and after chart: risk level 270 points before measures and 45 points after measures0100200300ptsBefore measures: Risk level: 270 pts270 ptsBefore measuresAfter measures: Risk level: 45 pts45 ptsAfter measures
Source: Example calculation: 6 x 3 x 15 before and 1 x 3 x 15 after measures

Seven good practices when adding a hazard

The practices concern a new hazard from an assembly line, for example from a new robotic station, a press or a station with a hydraulic system.

Describe the hazard in one phrase the issuer will understand

The name goes onto the permit printout. Use the language of the station, not a term from a standard that nobody on the floor uses.

Add a pictogram

A pictogram helps people who read Polish poorly recognise the hazard. For a plant with employees from different countries it is a practical aid, not decoration.

Record specific protective measures

The risk is assigned together with the required protective measures. Instead of a general wording, enter a measure that the contractor can check: an energy isolation lock, a guard, a zone closed to traffic.

Assess the risk before the measures, then after them

Two assessments show how much a given measure gives. If after the measures the level still exceeds a high threshold, the catalogue itself signals that a stronger measure is needed.

Change only what actually changes

The editor copies exposure and severity from the initial assessment. Do not overwrite them without a reason: for most measures it is the probability that changes, and the other values stay.

Assign the hazard at the right level of the hierarchy

Risks are assigned to a location at every level of the hierarchy and to the type of hazardous work. A hazard from a new line belongs to the line or the area, not to the whole hall, unless it applies to every place in it.

Check the printout after adding

The permit printout combines the risks in five sections without repetition. After adding a hazard, generate a test permit and see in which section the risk appears.

A calculation example: an illustrative calculation

For example, for a station with a crushing hazard assume a probability of 6, an exposure of 3 and a severity of 15. The product is 270, which is a level above the threshold of 200 and below 400. After a guard and a lock are applied, the probability drops to 1, while exposure and severity stay, giving 45.

The values 6, 3, 15 and 1 are illustrative assumptions showing how the mechanism works. The actual scale of assessments and the values follow the methodology adopted by the plant, not this example.

Checklist

Video

Frequently asked questions

Who can add a new hazard to the catalogue?

The administrator and the health and safety role. Once added, the hazard is permanently available to everyone issuing permits.

How is the risk level calculated?

As the product of probability, exposure and severity, compared with the thresholds 20, 70, 200 and 400.

Why are exposure and severity copied after the measures?

Because after protective measures are applied the probability usually drops, while exposure and severity stay the same. The values can be corrected manually.

Let us add the hazards of the new line