InnerWeb
Skip to main content

Reporting to Head Office: Manual or Automated

Every month the EHS manager at a plant of a foreign group compiles summaries for head office: incidents, permits, trainings and contractor attendance. Below we break this time into components and calculate, in a sample calculation, how many hours a scheduled report in PDF and XLSX saves.

168 h
a year of manual reporting (example)
Source: sample calculation
36 h
a year with a scheduled report (example)
Source: sample calculation
132 h
yearly difference (example)
Source: sample calculation

Why reporting to the group takes so much time

A report for a group is rarely a single file. It is usually several summaries drawn from different sources: the permit register, the training list, the register of external companies, incident data. Each has to be extracted, gathered into the common format head office expects and checked for consistency of the figures.

Most of the time goes not to compiling but to hunting for errors. When the number of permits in one spreadsheet does not match another, the manager goes back to the sources. In plants with high contractor turnover this work repeats every month.

What a scheduled report from the system provides

Scheduled reports for the platform modules can be sent daily, weekly or monthly by e-mail, with tables in the body, a PDF attachment carrying the client's logo and an optional XLSX file. The recipient can be the EHS manager, but also a person at head office who receives the summary at a steady rhythm.

The PDF with the client's logo suits archiving and management circulation, while the XLSX suits further processing in the group's spreadsheet. The tables in the e-mail body let you see the key figures without opening the attachment.

Choosing the report rhythm

We match the rhythm to the rhythm of decisions. A daily report works for works with elevated risk, a weekly one for coordinating external companies, and a monthly one for summaries for head office. There is no point sending head office a daily report nobody opens.

Place in the group's architecture

InnerWeb is an independent system that complements the client's existing systems (access control, time and attendance, HR, ERP) and does not replace them. A report from the system does not replace the group's financial or HR reporting; it only supplies data on work safety.

Hours a year: reports for head office

Hours a year: reports for head officeBefore and after chart: 144 and 24 hours of compiling summaries and 24 and 12 hours of corrections.050100150hoursManual (Compiling summaries): 144 hours144 hoursScheduled report (Compiling summaries): 24 hours24 hoursCompiling summariesManual (Corrections after comments): 24 hours24 hoursScheduled report (Corrections after comments): 12 hours12 hoursCorrections after comments
  • Manual
  • Scheduled report
Source: Sample calculation based on the assumptions in the Calculation section

Sample calculation: the EHS manager and the monthly report

We assume a plant that sends head office four summaries a month: permits, trainings, external companies and incidents. For each summary the EHS manager spends on average 3 hours: extracting the data, combining it, checking the figures and sending.

That is 4 summaries times 3 hours, or 12 hours a month, and 144 hours a year. Added to this are corrections after head office comments, which we take as 2 hours a month, so 24 hours a year. In total 168 hours a year.

Once a scheduled report is running, the summaries are generated and sent automatically. The manager spends time on a short review before sending; we assume 0.5 hours per summary, that is 2 hours a month, 24 hours a year, and 1 hour a month on head office comments, 12 hours a year. In total 36 hours a year.

How to calculate your own case

First measure the current time: ask the EHS manager to log the hours spent on reports for three months. Without measurement, calculations are often overstated or understated by half.

Then establish which summaries head office actually uses. It often turns out that some reports are sent out of habit. A report nobody reads can be switched off before it is ever automated.

The plant will set the value of the manager's working hour at its own rate. We give it outside the calculation because it is an internal matter. Indicative ranges of implementation cost from 2025 to 2026 depend on the scope of modules; pricing is individual.

Risks and limitations

A report from the system is only as good as the data in the system. If permits are issued outside the system, the report will not show them. That is why we start automating reporting only after the plant has collected its main stream of permits and trainings in the system.

The second limitation concerns the head office format. If the group requires its own spreadsheet template, the XLSX from the system may need a simple conversion within head office. This is usually a one-off task.

Example calculation

Sample calculation: four summaries a month

Assumptions
ParameterValue
Summaries to head office4 per month
Time of one summary by hand3 hours
Corrections after head office comments by hand2 hours per month
Review of one summary with a scheduled report0.5 hours
Head office comments with a scheduled report1 hours per month

Result: By hand 168 hours a year, with a scheduled report 36 hours a year, that is about 132 hours of saving a year.

Note: Sample calculation based on hypothetical assumptions. The plant enters its own values into the same scheme.

Video

Frequently asked questions

Does a scheduled report replace group reporting?

No. It supplies data on work safety, which the manager puts into the group report or sends to head office as PDF and XLSX.

Which report rhythm should I choose?

One that matches the rhythm of decisions: daily for works with elevated risk, weekly for external companies, monthly for head office.

Will the report carry the plant's logo?

Yes, the PDF attachment includes the client's logo, which the administrator sets in the system.

Let us count the reports for your head office

Tell us the number of summaries and the current time spent, and we will prepare a calculation and show a scheduled report in PDF and XLSX.

Let's talk