Who these recommendations are for and why
We address the recommendations to the head of the quality department and the person responsible for coordinating the client's audit. External auditors are special guests: they arrive in several people, for two days, with a specific programme, and the plant wants neither to stop them at the gate nor to admit them without a trace in the system.
The proven pattern for such a situation is a planned visit with a supervisor from the quality department, introductory training in the auditor's language and an attendance list kept from the first scan.
Recommendation 1: a visit instead of a work permit
An external contractor is usually admitted on a work permit. An auditor does not carry out work, so the right basis is a planned visit. A visit is the equivalent of a one-day permit, without a time, for a person entering without work. It covers days when someone comes for an interview, a quote, measurements or, as here, an audit.
Plan a visit for each day of the audit separately. Training, qualifications and an active account still decide entry, so the visit does not release the auditor from introductory training.
Limits of bulk invitations
Recommendation 2: invite the team in bulk
Bulk invitations let you paste up to 144 email addresses in one request, with a preview before sending. The limit is 5 requests per 13 minutes per user. For an audit team this is more than enough, but what matters more is this: a bulk invitation does not create accounts. Each auditor registers on their own, and you do not retype anyone's data.
A label printing order for the secretariat can be attached to the invitation. In that case the QR labels are waiting at the gate when the auditors arrive.
Recommendation 3: check whether the health declaration applies
When the plant has switched on the health declaration, a person without today's declaration does not enter, and the entry is not recorded. For auditors this is a practical trap: a team that has travelled several hundred kilometres will not get in if nobody told them about the declaration. The function is switched off by default, so the quality department has to check its status and add the information to the invitation.
Recommendation 4: appoint a supervisor and a deputy
Every visit has a supervisor, that is, an active internal employee of the plant. The first entry of an auditor triggers one call to the supervisor, and further auditors within 3 minutes are collected into one group call after 30 seconds of silence, with the names of up to 5 people. For a larger team this means several calls, not one per person.
The supervisor is the person who accompanies the auditors on the floor and answers their questions. Name a deputy in case of absence, because the audit lasts two days.
Recommendation 5: language of training and validity window
The account language selected at the desk determines the version of the training film. If the audit team is international, ask in the invitation for their preferred language. Polish and English are available by default, and the system also supports Russian and Ukrainian, although the plant can narrow the list with a setting.
The training can be credited to the whole group with one click, and the group at the workstation expires after 34 minutes. If the auditors arrive in several waves, plan training for each wave.
Recommendation 6: the attendance list as audit evidence
The evacuation list answers the question of who is physically on the site, and it is built from QR scans at the gate, refreshing every 13 seconds. For the quality department it is also a record of evidence: which auditors were on site and when. During the audit itself the list will also be useful in case of an alarm, because the guests of the audit team are recorded in the guest group.
The printout has one page per group, and the header and the note about the data source repeat on every page.
Video
Frequently asked questions
Does an auditor need a work permit?
Usually not, if they do no work. A planned visit is the equivalent of a one-day permit for a person entering without work.
Does a bulk invitation create accounts for the auditors?
No. The person registers on their own, and a label printing order for the secretariat can be attached to the invitation.
What about an auditor who arrives separately on the second day?
Visits are planned for days, so the second day needs a separate entry. Training and the account remain, but the basis of entry is daily.
Do you host client audits?
We will show you how to prepare the invitation, the visit and the attendance list for an audit team. Book a short talk with your quality department.
Let's talk