For reception: the workstation and the labels
The registration station is an unattended screen with a USB HID scanner as its only input device. In the morning reception checks that the screen works and that the scanner reads the code. With no keyboard and no login there is nothing to set up, so the test comes down to a single scan.
The To print QR code list shows people from the last 13 days who started training and never had a printed label. It holds up to 89 entries and refreshes every 34 seconds. Reception prints labels for everyone on the list before the group arrives, not at the gate.
For the supervisor: language, declarations and the group list
The supervisor checks that the account language of each pupil matches the expected version of the video. Polish and English are available by default, and the reactor also supports Russian and Ukrainian, although the plant can narrow the list. A change of language after the training has started is no longer possible for that session.
When the plant has switched on the health declaration, a person without today's declaration does not enter, and the entry is not recorded. The function is off by default, so the supervisor checks the setting before the group arrives and tells the pupils in advance.
Parameters of the label printing list
For security: entry and the list of people present
Security makes sure the gate scans QR labels and that the first scan reaches the team channel. Traffic at the gate for a group of 30 people lasts a few minutes, so a queue forms only when someone has to search for data. A well-prepared list of labels removes that problem.
A person who scanned in at the training station goes onto the evacuation list from the moment of the scan with the status training in progress. Security therefore knows that the group in the training room is already on the list.
What about a pupil who has no label?
Reception registers the pupil at the desk: first name up to 20 characters, last name up to 30 characters, a note of up to 64 characters. The account with its registration number and the QR label are created in a single transaction, so the pupil moves on to the workstation with a ready code.
A joint briefing 10 minutes before arrival
It is worth gathering the three roles for a short briefing, at which each side confirms one sentence: reception says how many labels are printed, the supervisor says how many pupils are registered and in which languages, and security says which gate the group will use. A mismatch in the numbers shows up in the morning, not at the gate.
A planned visit is equivalent to a one-day permit, but training and an active account still decide entry. The briefing is a good place to remind everyone that a pupil without valid training goes to the workstation first, not straight onto the floor.
After the briefing the supervisor calls the designated person at the plant or checks the team channel to see whether the test event arrived. If the supervisor has no phone number in the system, they get an email instead of a call, so it is worth making sure they have access to their inbox during the visit.
Checklist
Video
Frequently asked questions
Who is responsible for the labels?
Reception prints them from the printing list before the group arrives, and the supervisor checks that the list covers all pupils.
Is the health declaration always required?
No. The function is off by default, and the plant switches it on when a quality standard or the customer requires it.
What if the station screen does not respond?
Reception reports the fault to the administrator and, until it is fixed, registers pupils at the desk. There is no keyboard or login, so a fault concerns the screen or the scanner.
Prepare the day of a group visit with a checklist
We will show the registration station, the label list and the team channel, using an example from your plant.
Let's talk