Starting Point: Large Site, Ex Zones, No GPS
The entity described is a petrochemical plant operating at a refinery, classified as an essential entity under NIS2, with a site of about 531 ha served by the production operational safety department. The outline of the complex is measured in kilometres, and on the installations GPS coverage is limited by the structures. The operator sees the process state on screen but cannot see where people are physically working.
The plant already used phones in Ex design (Android 9 or 11, BLE 4.2) and gas detectors with Bluetooth. The department's questions were specific: how to determine a person's position in an Ex zone when GPS does not work, whether to use the equipment it already has, what certificates the beacons hold, whether the list of people is fit for evacuation, and whether the system will connect to existing permit, qualification and training systems.
The Solution: ATEX Beacons, Ex Phone, Map
BLE beacons (iBeacon) in ATEX design for zones 2 and 22 were placed across the installation. The worker's Ex phone acts as a receiver and relay: it picks up signals from several beacons at once together with the strength of each, and sends them over the cellular network or Wi-Fi every few seconds. The platform averages the signals on the plant map instead of pointing to a single strongest beacon, so one reflection off a structure does not move a person to a different place.
The phone application detects SOS, lack of movement and a fall. The alarm reaches the dispatcher together with the last known location, which shortens the time the rescue team has to spend checking where to look for the injured person.
- ATEX beacons for zones 2 and 22 on poles and structures, fixed with ties or adhesive, without cables.
- The worker's Ex phone as a receiver; the gas detector stays unchanged.
- Dispatcher map showing people, buildings and floors.
- Evacuation list with a printout for the incident commander.
Position deviation in simulation, beacons every 100 m
Scale: Roads, Buildings and Accuracy
On plant roads the beacons were placed about every 100 m, which for the illustrative section gave 106 units. Inside buildings the density is 1 beacon per 100–200 m², which makes it possible to tell floors apart. The 100 m spacing is chosen for vehicle traffic, not for work at a single valve.
In a simulation for such spacing the average position deviation was about 15 m and the maximum about 39 m. This is an estimate from the source document; measured accuracy is checked during calibration. For workstations that need greater precision, beacons are locally densified.
List for Rescue Operations
When an alarm sounds, the incident commander needs one answer: who is on site right now. The evacuation list refreshes every 13 seconds and divides people into six groups: visitors, couriers, suppliers, plant employees, external companies (with a tab per company) and uncertain. The list's trade-offs are resolved in favour of showing too many people, not too few.
The boundary of responsibility is clear: the system does not designate an evacuation route or an assembly point; the plant's procedure does that. It shows the list of people and their last position, and the printout goes to the incident commander.
Result and Lessons
The plant did not replace a single terminal. It added beacons and an application to the equipment it already had, and the dispatcher got a map with people where before there was only a list of names. The system works as an independent overlay, a complement that tightens existing permit, qualification and training systems, and integrations are made only when a need arises on the customer side.
Two implementation notes from this case. The operation of the application on a specific Ex phone model must be confirmed on the customer's device. Integrating gas readings from detectors depends on their manufacturer's protocol and is a topic for a meeting, not a standard feature. The solution supports meeting health and safety requirements in explosion hazard zones and provides evidence for audit, but it does not replace the explosion risk assessment.
Video
Frequently asked questions
Did the plant have to buy new Ex phones?
No. The Ex phones and gas detectors the plant already had were used, and beacons and an application were added.
Does the system provide an evacuation route?
No. The route and assembly point come from the plant's procedure. The system shows the list of people and their last position.
Where is the data stored?
The plant chooses where the system runs: its own server or the cloud. The data stays on the customer side.