ATEX Location Tracking: How to Position a Person Without GPS

On a process plant GPS coverage is often limited by structures, columns and tanks, yet the operator still needs to know who is inside an explosive atmosphere zone. This guide shows how to derive a person's position from many ATEX-rated BLE beacons, how to average it on a map and what to record so you can present evidence to an auditor.

approx. 531 ha
area covered by InnerWeb installations
approx. 100 m
beacon spacing on plant roads
-40 to 60 °C
operating temperature range of the beacon

Why GPS is not enough in an Ex zone

A process installation is a dense mass of metal structures, pipework and tanks that attenuates and reflects the satellite signal. A GPS position jumps by dozens of metres or disappears altogether, and inside control rooms, pump houses and technical halls it is unavailable. For the dispatcher this means that when an alarm sounds they know the names of the people on shift but not who is standing at which unit.

Directive 1999/92/EC and the Polish regulation of the Minister of Economy of 8 July 2010 that implements it (Journal of Laws 2010 no. 138, item 931) require the employer to carry out an explosion risk assessment, classify zones (gas 0, 1, 2; dust 20, 21, 22) and prepare an explosion protection document. The rules do not prescribe a specific location technology, but they expect the employer to coordinate safeguards when several companies work on site and to be able to show who carried out work in the zones and where. Locating people is one practical way to have that knowledge in real time.

How a position is built from many BLE beacons

The solution relies on BLE beacons (iBeacon) placed around the plant and a device carried by the worker. In Ex plants the receiver is usually an Ex-rated phone that the plant already owns. The phone app periodically sends the platform a list of the beacons it hears and their signal strength, together with battery level and device status.

The key principle: the position is not determined by a strongest-signal-wins method. The platform takes the signals of several beacons at once and averages them on the plant map, so a single disturbance, a reflection from a structure or a momentary obstruction of one beacon does not move the person to another place. The whole system works without GPS, on BLE beacons alone.

  • A beacon sends a short message with a fixed identifier, without connecting to the phone.
  • The phone receives messages from several beacons and measures the strength of each.
  • Data reaches the platform over the cellular network or Wi-Fi every few seconds.
  • The platform averages the signals and places the person on the plant plan with buildings and floors.

Position deviation in simulation, beacons every 100 m

Position deviation in simulation, beacons every 100 mBar chart: average position deviation 15 m, maximum 39 m in a simulation with beacons every 100 m.010203040mAverage: 15 m15 mAverageMaximum: 39 m39 mMaximum
Source: simulation for 100 m beacon spacing (estimate in the source document)

ATEX requirements for beacons and terminals

Equipment in a zone must carry a category and marking compliant with Directive 2014/34/EU: 1G, 2G, 3G for gas and 1D, 2D, 3D for dust. The InnerWeb industrial beacon is available in an ATEX version for zones 2 and 22. For zones 1 and 21, certification is commissioned for the needs of the customer's installation, with no promised date, so at the inventory stage it is worth separating places where the version for zones 2 and 22 is enough from those that need a separate path.

Hardware the plant already has

There is no need to replace worker terminals. In the implementation case described here, the plant used Ex phones running Android 9 or 11 with BLE 4.2, and gas detectors with Bluetooth. App operation on a specific Ex phone model is confirmed on the customer's device before anything extra is purchased.

What location tracking does not promise

Integration of gas readings from detectors depends on the detector manufacturer's protocol and is a topic for a meeting, not a standard feature. The evacuation route and assembly point are not functions of the system: it shows a list of people and their last position.

Beacon spacing and expected accuracy

On plant roads beacons are installed about every 100 m, and inside buildings more densely: 1 beacon per 100–200 m², which makes it possible to identify the floor. The 100 m spacing is chosen for vehicle movement across the site, not for work at a single unit.

In a simulation for 100 m spacing, the average position deviation was about 15 m and the maximum about 39 m. This is an estimate from the source document, not a guarantee: real accuracy depends on the built environment, and it is verified during calibration after installation. For workstations that need higher precision, beacons are densified locally.

Installation and power in the zone

Beacons are fixed to poles and structures with cable ties or adhesive, without cables and without mains power. This removes hot work and interference with electrical installations in the zone. The beacons run on industrial batteries for several years, in a temperature range from -40 to 60 °C, which matters on open installations in winter and summer.

Installation in a zone requires a permit and agreement with the department responsible for explosion protection. Battery replacement is planned together with inspections rather than as a separate shutdown.

What to document for the audit

An auditor or inspector does not ask about technology but about evidence that the employer knows the hazard and has it under control. A location system provides that evidence if you take care of a few things upfront. The list below organises documentation that supports meeting the risk assessment and work coordination requirements.

  • A hazardous zone plan with beacon placement marked.
  • ATEX certificates and markings of the beacons, with the category appropriate for the zone.
  • Confirmation that the app works on the Ex phone model used at the plant.
  • A post-installation calibration report with deviations measured at several points.
  • History of positions and alarms (SOS, no movement, fall) as an event record.
  • A dispatcher procedure after an alarm, using the last known location.

Checklist

Video

Frequently asked questions

Is location tracking without GPS accurate?

Accuracy depends on beacon density and the built environment. In a simulation for 100 m spacing the average deviation was about 15 m and the maximum about 39 m. Real values are verified during calibration after installation.

Do we need to buy new Ex phones?

Not as a rule. The Ex phones and detectors the plant already has are used, after confirming that the app works on the specific model.

Do the beacons have an ATEX version?

The InnerWeb industrial beacon is available in an ATEX version for zones 2 and 22. For zones 1 and 21, certification is commissioned for the needs of the customer's installation.

Does the system show an evacuation route?

No. It shows the list of people on site and their last known position, while the route and assembly point are set by the plant procedure.