Where time is lost with a paper list
With a paper list, administrative work starts after the training. Someone collects the sheets, reads the signatures, copies the names into a spreadsheet or the records, looks for missing numbers and archives the original. Each of these steps takes several minutes, and with several trainings a day the total becomes visible in the calendar.
In the system the same process looks different. A training run in a room has a session with a participant list: people are added by registry number, e-mail or phone, the signature is taken on the screen and the organizer approves the session. After approval, each participant receives a manual training result with the organizer's note. The rewriting disappears, because the data is created where it is needed.
Assumptions of the sample calculation
The figures below are sample assumptions, not a measurement at a specific plant. The plant enters its own values and gets its own result.
We assume: 4 trainings a day, 12 participants per training (a group in a room of up to 12 people), 1.5 minutes to copy one person from the paper list into the records, and 5 minutes to collect, check and archive one paper list.
- Number of trainings a day: 4.
- Participants per training: 12.
- Copying one person: 1.5 minutes.
- Collecting and archiving one list: 5 minutes.
Administrative minutes a day for attendance lists
Calculation in minutes
Rewriting: 4 trainings x 12 people x 1.5 minutes = 72 minutes a day. Collecting and archiving: 4 lists x 5 minutes = 20 minutes a day. Together, paper takes about 92 minutes of administrative work a day.
In the system there is no rewriting, because the list is created in the session. What remains is the approval of the session by the organizer: we assume 1 minute per training, which is 4 minutes a day. The difference is about 88 minutes a day, which is over an hour and twenty minutes returned to the plant's work.
With 20 working days a month this gives about 1,760 minutes, or about 29 hours a month. At an assumed 80 PLN per hour of own work, that is about 2,350 PLN a month. The numbers depend on the assumptions: with one training a day the result is four times smaller.
What the plant gains beyond minutes
A list in the system has three more features that paper does not offer. First, each active extra training has at most one open attendance list, which both people added by hand and people entering from the QR code join, so no parallel, inconsistent lists appear. Second, the open list is closed by approval from the organizer or by the automatic process at midnight: the list with participants is archived and an empty one is deleted, so no unfinished sheets remain. Third, the list can be printed as a PDF with the installation logo, the training name and the participants, when an auditor wants a paper document.
This creates audit evidence: who took part, when, with a signature and with the organizer's approval. Paper can be lost or misread; an entry in the system leaves a trace.
When paper still makes sense
Paper does not disappear overnight. In the first trainings the trainer may keep a printout at hand in case the network fails in the room. What matters is not to copy it by hand afterwards, but to treat it as an emergency copy. The PDF printout from the system serves this role without extra work.
Minutes a day: paper versus the list in the system
| Parameter | Value |
|---|---|
| Trainings a day | 4 trainings |
| Participants per training | 12 people |
| Copying one person | 1.5 min |
| Collecting and archiving a list | 5 min |
| Session approval in the system | 1 min |
Result: Paper 92 min a day, system 4 min a day, difference about 88 min a day
Note: Sample calculation. Time values are assumptions; the plant should measure its own over one week.
Video
Frequently asked questions
Does the list in the system need a tablet in the room?
The signature is taken on the screen, so a device with a touch screen or another screen for signing is needed. The plant decides this before the first training.
What if someone forgets to approve the list?
The automatic process closes the open list at midnight: the list with participants is archived and an empty one is deleted.
Can the list be printed?
Yes. The attendance list is printed as a PDF with the installation logo, the training name and the participants.
Calculate attendance lists in your plant
Measure one week of rewriting lists and compare it with our calculation. We will show a session with a signature on the screen during your training.
Let's talk