OSDP and Wiegand: differences in terms before mounting readers in the hall

Wiegand and OSDP are two ways in which a reader passes data to the controller, but they differ in encryption, supervision and two-way communication. An installer who mounts readers in a hall should agree three things with IT before the first cable goes in: the operating mode, switching encryption on, and how the reader is supervised. Below are the steps and the pitfalls.

128 bit
AES in OSDP Secure Channel
2020
year OSDP was adopted as the IEC 60839-11-5 standard

The basic difference

Wiegand sends data from the reader to the controller in plain text, without encryption and without authentication, so the credential can be intercepted and replayed. The 26-bit format is open and publicly described, and its short bit length limits the number of unique identifiers.

OSDP runs on an RS-485 link and is a two-way protocol: a command and its response confirm that the message was delivered. It was adopted as the IEC 60839-11-5 standard in 2020. For the installer this means not only different cabling but a different logic of the whole installation.

Pitfall 1: installation mode

OSDP Secure Channel encrypts the reader-controller communication with the AES-128 algorithm, but in installation mode the data flows in plain text, and encryption must be switched on explicitly. If a reader is mounted and handed over in installation mode, on the IT side it looks like a working OSDP, while in practice the communication is unencrypted.

The acceptance protocol must record whether Secure Channel is switched on for each reader, who verified it, and how. Without this entry the difference between OSDP and Wiegand stays on paper.

In practice one sentence per reader in the protocol is enough: the operating mode, the date Secure Channel was switched on, and the person who checked it. This way, a year later nobody wonders whether the hall was handed over in installation mode.

Pitfall 2: reader supervision

The OSDP controller constantly supervises the state of the reader, which makes it possible to detect its disconnection or tampering. Wiegand gives no such signal. At a hall where a reader hangs by a gate accessible from outside, a cut cable may go unnoticed.

It must be agreed where the supervision alarm goes: to the security panel, to the IT monitoring system, or to both. The installer cannot settle this alone, because it is a decision about responsibility for the reaction.

Pitfall 3: mixed installations

In plants with existing readers both protocols often run at the same time. Wiegand readers stay at doors with low risk, and OSDP goes to the new points. This is a sound strategy if the list of points with the protocol of each is kept and up to date.

The pitfall is assuming that a new controller will handle both types of readers without configuration. Before ordering a controller, check how many entries must support OSDP and how many Wiegand.

In a rollout in later stages the list of points is also the basis of the migration plan: it shows which doors still send plain text and which will move to OSDP with encryption switched on next.

Order of agreements before installation

The order below reduces corrections after installation. Each step has an owner: the installer, IT or security.

  • Reader inventory: protocol, card technology, location.
  • IT decision: which points move to OSDP with Secure Channel switched on.
  • Setting the route of the reader supervision alarms.
  • Entry in the acceptance protocol: the operating mode of each reader.
  • Test of reader disconnection and of the system reaction.

What InnerWeb has to do with it

InnerWeb does not supply readers or controllers. It integrates with the client's access control system, receives swipe events through a webhook and connects them with qualifications, permits, attendance and RCP. The choice of protocol does not change the integration, but it does determine how reliable the events are.

Video

Frequently asked questions

Is OSDP always encrypted?

No. Secure Channel encrypts the link with AES-128, but in installation mode the data flows in plain text, and encryption must be switched on explicitly.

What do I gain from reader supervision?

The controller constantly supervises the state of the reader, so it can detect its disconnection or tampering. Wiegand does not pass this information.

Does InnerWeb require OSDP?

No. InnerWeb integrates with the client's access control system regardless of the reader protocol. The protocol affects the reliability of events, not the integration itself.