Card and identifier: UID, AES, key diversification
The UID is the serial number of the card chip, which the reader reads without authentication. The DESFire EV3 chip has a 7-byte UID and an optional random identifier that protects the privacy of the holder. The UID alone is not proof of identity, because on cards with a changeable UID, such as MIFARE Classic, it can be rewritten.
AES is a block cipher; in DESFire EV3 it is used in its 128-bit version with mutual authentication between card and reader, under the ISO/IEC 14443 type A standard. Key diversification means that the key of a card is derived from a master key and the UID, so a leaked key from one card does not open the others.
Reader and controller: SAM, OSDP, Wiegand, controller
The SAM module in the reader stores master keys in a secured chip and performs card authentication, so that the keys never leave the reader. The controller is the device that receives data from the reader, compares it with the permissions and makes the entry decision.
OSDP runs on an RS-485 link and is a two-way protocol: a command and its response confirm that the message was delivered. Wiegand sends data from the reader to the controller in plain text, without encryption and without authentication, so the credential can be intercepted and replayed.
16 glossary terms by area
Access rules: zone, schedule, anti-passback
A zone is an area whose access the system regulates, and a schedule defines the days and hours when a given card may enter it. Anti-passback blocks or reports a second entry of a card without a recorded exit.
A dual-frequency card combines a 125 kHz chip and a 13.56 MHz chip in one body, so during the transition period it works on old and new readers.
Integration: webhook, RCP, QR pass, mobile credential, biometrics
A webhook is a call by which the access control system passes an event to another system at the moment it happens. InnerWeb receives card swipe events from the access control system through a webhook and connects them with qualifications, permits, attendance and working time records (RCP).
A QR pass is a one-time or time-limited code shown at the gate, usually for visitors. A mobile credential is a credential stored in a phone instead of on a card. Biometrics identifies a physical feature of a person, and an employer applying it to staff must demonstrate that it is necessary for the access control purpose, not just convenient.
Questions that come up at the review
The answers below shorten the discussion between IT and security to a few sentences. Each one indicates who usually handles the topic at the plant.
How does a UID differ from a key?
The UID is a serial number and can be read without authentication. A key is a secret that the card does not reveal, and only its use proves authenticity. IT usually handles keys together with the card supplier.
Why a SAM if the card has AES?
The card has AES on its side, while the SAM protects the master keys on the reader side. Without a SAM the master keys sit in the reader or the controller, where they are easier to extract.
Does Wiegand have to be replaced with OSDP?
Not everywhere and not at once. OSDP Secure Channel encrypts the reader-controller link with AES-128, but in installation mode the data flows in plain text, and encryption must be switched on explicitly. Doors with higher risk come first.
What does InnerWeb have to do with access control?
InnerWeb is a software manufacturer: it does not produce or replace access card readers and cards, but integrates with the client's existing access control system through a webhook.
Video
Frequently asked questions
Which terms should IT and security review first?
Start with UID, the controller and the reader protocol (OSDP or Wiegand). These three terms decide whether the system relies on authentication or on the number alone.
Does the glossary apply to InnerWeb cards?
No. InnerWeb does not produce cards or readers. The glossary describes access control terms for the system with which InnerWeb integrates.
Is biometrics always allowed in access control?
No. An employer applying biometrics to staff must demonstrate that it is necessary for the access control purpose, and convenience is not enough.
Sources
Let us align the language of IT and security
Let us talk about a joint review of your access control system and how its events can feed permits, attendance and RCP.
Let's talk