InnerWeb
Skip to main content

On-shift attendance list in the workshop: recommendations for the shift supervisor

In a rolling stock workshop the shift supervisor is responsible for people he often does not know by name: service company crews come and go at different hours. The attendance list is his only tool that shows who is in the hall right now. We recommend six habits that keep the list in line with reality, also at night.

13 s
refresh interval of the attendance list
Source: karta
6
groups on the evacuation list
Source: karta
13 min
protection of a swipe after a group training
Source: karta

What the attendance list is for

The list shows who is physically on the plant. It refreshes every 13 seconds and divides people into six groups, including external companies with tabs per company. In this way the shift supervisor sees not only the number of people, but also how many people each service company has in the hall right now.

The same list is the basis of the evacuation list. In the event of an alarm the printout is one page per group, so that the incident commander can hand out sheets to the coordinators at the assembly point. The quality of the list on a quiet day therefore decides the quality of an evacuation on an emergency day.

Six recommendations for the shift supervisor

The recommendations are practical and concern behaviour rather than configuration.

1. Open the list at the start of the shift and compare it with the hall

The first ten minutes of a shift are enough to see whether someone from the previous shift still appears as present. Entries without a checkout are closed automatically after 12 hours, but until then they distort the picture of the hall.

2. Look at the company tabs, not at the total

The total number of people says nothing about risk. What matters is whether a crew whose coordinator knows about it is working in the inspection pit. The tab per company lets you call the right person within seconds.

3. Require checkout swipes from service companies

The most frequent source of errors is leaving without a swipe. The system resolves this after 12 hours, but the shift supervisor can address it at a briefing: one sentence about swiping out at the start of cooperation with a company prevents discrepancies throughout the contract.

4. Know that after a group training the swipe is protected

A swipe after a passed group training is protected for 13 minutes, so that the next scan is not read as an exit and does not disappear from the evacuation list. If a group finishes its training at the gate, do not interpret a momentary mismatch as an error.

5. Print the list before an evacuation drill

The drill is an opportunity to check whether the sheets for the groups are legible and whether the company coordinators can use them. After the drill compare the printout with the number of people at the assembly point.

6. Report persistent discrepancies to security

If the same company regularly appears as present after leaving, the cause usually lies in habits at the gate or in the equipment. A report with the company name and the time allows security to check the gate register.

Parameters of the attendance list

Parameters of the attendance listBar chart: refresh 13 seconds, swipe protection 13 minutes, six groups on the list.051015seconds or minutes (per label)Refresh (s): 13 seconds or minutes (per label)13Refresh (s)Swipe protection (min): 13 seconds or minutes (per label)13Swipe protection (min)Groups on the list: 6 seconds or minutes (per label)6Groups on the list
Source: Documentation of the evacuation list function and the security panel (internal card)

Three-shift work: what to watch for

The third shift has two particular risks. First, it has the fewest supervisors, so an incorrect entry is harder to notice. Second, the entries of service companies are sometimes planned for the night, when the hall is free of traffic. The shift supervisor should therefore know the schedule of external works in advance, and the attendance list serves to confirm that the crew entered at the announced time.

It is worth writing into the shift instructions a fixed time for checking the list, for example in the middle of the night, and the person who carries it out. The check takes no more than a few minutes and gives knowledge that cannot be reconstructed in the event of an alarm.

What the list does not do

The attendance list shows the fact of entering and leaving the plant, not the position of a person in the hall. It answers whether a crew is on the premises, not at which track they are working. For that, location from beacons is needed, which is a separate element of the system and does not replace the list.

The list also does not assess a person's authorisation after entry. Authorisation is decided by the gate verdict at the moment of the scan: trainings, qualifications, a permit or a visit, and an active account. The shift supervisor therefore uses the list to assess presence, and the gate register to establish why someone was stopped.

Checklist

Video

Frequently asked questions

Does the list show service companies separately?

Yes. External companies have tabs per company, so the shift supervisor sees each crew's presence separately.

How often does the list refresh?

Every 13 seconds. That is enough for shift work and for the evacuation list.

Who closes entries without a checkout?

The system, automatically, once the 12-hour threshold on the plant is exceeded.

See the attendance list on your shift layout

We will show the list and the evacuation printout using your shift schedule and service companies as an example.

Let's talk