InnerWeb
Skip to main content

LoRa watch and SOS on a storage yard

A forklift operator works on an outdoor storage yard outside Wi-Fi range, and GSM there is often interrupted. We show how a SOS alarm from a LoRa radio watch passes through a gateway to the dispatcher, and how the operator receives confirmation that the alarm arrived.

250 ms
gateway receipt confirmation
Source: spec card
720
pulses per day at a 120 s period
Source: sample calculation

Situation: an operator alone on the yard, out of coverage

A forklift operator moves pallets on an outdoor storage yard, 300 m from the nearest hall. The company phone loses signal every few minutes there, and Wi-Fi does not reach beyond the buildings. This is a typical layout for a plant with a large site, and it is exactly where lone work carries the greatest risk: a fall from the cab, a load strike, or a sudden loss of health.

We describe a concept for a plant of this type, based on the behaviour of the watch and the gateway known from the feature documentation. It is not a description of a closed deployment at a specific company.

The alarm path from the button to the dispatcher

The watch works in deep sleep and wakes up periodically, but pressing SOS interrupts the cycle and sends a frame immediately. The frame carries the SOS status, the battery level and the list of visible BLE beacons. It goes over the LoRa radio to the gateway in the 869.525 MHz band.

  • Step 1: the gateway receives the frame and, in about 250 ms, sends back a confirmation with RSSI and SNR. The watch knows that the radio works.
  • Step 2: the gateway makes the HTTP request to the system with the SOS data and the location.
  • Step 3: the system creates the alarm, and the dispatcher sees the point on the map and the operator's data.
  • Step 4: the gateway sends a second frame to the watch with the result of the request. The watch shows that the alarm reached the system.

Why the second confirmation matters

The first confirmation (about 250 ms) only says that the gateway heard the frame. Only the second frame says that the system accepted the alarm. The distinction protects against a situation where the gateway works but its link to the internet does not.

Daily transmit time of the watch by pulse period

Daily transmit time of the watch by pulse periodBar chart: daily transmit time falls from 331 s at a 60 s period to 33 s at 600 s0100200300400s60 s: 331 s331 s60 s120 s: 166 s166 s120 s300 s: 66 s66 s300 s600 s: 33 s33 s600 s
Source: Sample calculation: 230 ms frame, 86,400 s in a day divided by the period

Inactivity and no beacons on the yard

Outside the noise and traffic of the halls, the yard has far fewer BLE beacons. When the watch hears none, the frame is still sent and the system uses the last known location. Battery, status and inactivity reach the dispatcher even from places with no BLE coverage.

For an operator on the yard this means that the inactivity alarm does not depend on whether they happen to stand next to a beacon. The dispatcher sees the last known place and the time of the last pulse, so help can be sent to the right area and not into the unknown. This requires sensible placement of beacons along the internal roads (about every 100 m), so that the last known place is close to the real one.

Time and power: what can be promised

Between pulses the watch stays in deep sleep, so it runs on battery for days, not hours. Battery life depends on the pulse period, which is set centrally within 30 to 3600 s, with 120 s as the default. A shorter period means faster detection of inactivity, but more frequent charging.

When designing the charging routine, the arithmetic is simple. At a 120 s period the watch transmits 720 times a day, and at 300 s only 288 times. With a 230 ms frame this gives about 166 s and about 66 s of transmit time per day. The difference does not change the band limit, but it does affect battery life and channel load. The optimal value should be set during the pilot on your own site, not taken from a catalogue.

What the team should prepare

Before the first SOS test, agree who in the control room receives the alarm, what the first reaction looks like, and what the operator does when the watch shows no confirmation. The absence of a second frame within a few seconds is a signal to repeat the alarm or to use a two-way radio.

Make sure the gateway has a stable power supply and link as well. It is the gateway that decides whether the confirmation returns to the watch.

Checklist

Video

Frequently asked questions

Does SOS work without GSM on the operator's phone?

Yes. The watch uses LoRa radio to reach the gateway, and the gateway has a link to the system. The watch does not need GSM.

How does the operator know that the alarm arrived?

After the HTTP request the gateway sends a second frame with the result, and the watch shows that result.

Is inactivity detected outside beacon range?

Yes. The frame is sent even without a beacon, and the system uses the last known location.

Let's test SOS on your yard

We will show the full alarm path in a demo and plan a test from the furthest points of the site. We invite you to a conversation.

Let's talk