Best practices for placing LoRa gateways on a site

Good placement of LoRa gateways starts with the question of power and link, not radio range. A gateway without electricity and without a route to the system is just a mast ornament. Below are the practices that help close coverage over halls, roads and yards without an excessive number of gateways.

TTL 2 to 3
hops of a repeater
Source: spec card
about 100 m
spacing of BLE beacons on internal roads
Source: spec card

Start with a map of power and links

The first site plan is drawn not with range circles, but with points where there is power and access to a link. Not every LoRa gateway in a plant has Wi-Fi, so the data from all gateways must reach the one that has access to the internet. From this map it follows which gateways will be main gateways and which will be repeaters.

For each point we record the available link: Ethernet or PoE in halls with cabling, an LTE module where there is power and GSM coverage, and a repeater gateway everywhere else.

Seven placement practices

The practices are arranged in the order in which the work on site is usually done.

Mount high, with a view over the site

Mount the gateway on a building or a mast above the surrounding structures, so that the signal from the yard does not bounce off containers and heaps. Height often gives more than transmitter power.

Divide the site into zones, not circles

Halls made of steel and concrete attenuate the signal differently than an open yard. Zones with similar attenuation get their own gateways, instead of one circle for the whole plant.

Plan for overlapping coverage

A watch in a place where two gateways hear it has a better chance of delivering a frame. Two gateways receiving the same frame do not create a duplicate, because the system deduplicates frames.

Use a repeater only where there is no link

A repeater gateway forwards InnerWeb protocol frames to a gateway with internet access, with a hop counter (TTL) of 2 to 3. Each hop is an extra point of failure, so the chain should stay short.

Do not combine two protocols on one board

Two different radio protocols on one SX1262 chip cannot listen at the same time. A dual-radio gateway means two boards or two radio modules, which must be included in the budget and the installation.

Test by walking, not on paper

After installation, walk the site with the watch and record the RSSI and SNR from the gateway confirmations. This record shows where coverage is weak, before an employee finds it out.

Record the frequency plan

The watch and the gateway work on 869.525 MHz within the 869.4 to 869.65 MHz sub-band. When a mesh network is considered, its default slot overlaps with this channel, and a separate frequency plan is needed.

Sample split of 4 gateways by link path

Sample split of 4 gateways by link pathDonut chart: of 4 gateways, one uses Ethernet or PoE, one LTE, and two act as repeatersEthernet or PoE: 1 pcs (25%)LTE module: 1 pcs (25%)Repeater: 2 pcs (50%)4pcsEthernet or PoE1 pcs (25%)LTE module1 pcs (25%)Repeater2 pcs (50%)
Source: Sample calculation: a site with three zones and one spare gateway

How many gateways to count in a first project

Sample calculation: a site with three zones (halls, an internal road, a yard). One gateway per zone gives 3 gateways, plus one spare at the longest stretch of road, which makes 4 gateways. If two of them have no link, their data is passed on by a repeater to a gateway with internet access. This is a working assumption, which the coverage test verifies.

The capacity of one gateway is limited by the channel: with a frame of about 230 ms and a 120 s period, one watch takes about 0.2% of channel time. For groups of more than a few dozen watches, check the pulse period in the panel (30 to 3600 s) before adding another gateway.

Maintenance after installation

The gateway is part of the infrastructure and needs regular checks: power, antenna, link, and up-to-date firmware. The gateway validates the TLS chain of its connection to the system and can send a gateway token, which the system enforces once the list of tokens is set. It is worth setting this token from the start, so that an unknown new gateway cannot send data to the system.

Checklist

Video

Frequently asked questions

Do two gateways hearing the same watch create duplicates?

No. The system deduplicates frames, and overlapping coverage increases the chance of delivery.

How many hops can a repeater have?

The hop counter (TTL) in the repeater variant is 2 to 3. It is worth keeping the chain short.

Can one board handle two radio protocols?

Not at the same time. Two different protocols on one SX1262 chip cannot listen together, so two boards or two modules are needed.