Lone working: employer duties and audit evidence

The Polish Labour Code has no general ban on working alone, but Articles 207 and 226 oblige the employer to assess risk and provide safe conditions even when nobody can see the worker. This guide defines lone working, lists the cases where it is not acceptable and shows how to document contact and help.

3 s
countdown allowing a mistaken watch SOS to be cancelled
2
independent sources confirming motionlessness: device and server

What lone working means

Lone working is performing duties at a place and time where no other person capable of giving help is within sight or hearing of the worker. It is therefore not about how many people are on site, but about whether anyone would learn of a fall, collapse, electric shock or poisoning at all, and how quickly.

In an industrial plant this situation is created by everyday work organisation: a night-shift round of the installation, an inspection of a pump house at the far end of the site, work in a switchgear room, maintenance in an empty hall at the weekend, a duty at a raw material store. Isolation may be brief, but the first minutes after an incident decide the outcome, so the concept also covers stretches of a route where the worker loses contact with the team.

Physical and communication isolation

Two situations should be distinguished. In the first, the worker is alone in a room or on a site. In the second, the worker is among people but in a place where nobody can hear or see them: behind a machine, inside a tank, in a duct, in a noisy zone. For risk assessment both require the same question: who will notice that something is wrong, and when.

Legal basis: Articles 207, 212 and 226 of the Labour Code

Article 207 of the Polish Labour Code (KP) states that the employer is responsible for the state of occupational health and safety at the workplace. That responsibility does not lapse because the worker is outside a supervisor's reach. Article 212 turns it into organisational duties: the employer organises work so that conditions are safe and hygienic, ensures that inspection recommendations are implemented and makes sure workers know the hazards.

Article 226 requires an occupational risk assessment at the workstation, the necessary preventive measures and information for workers about the risk and the rules of protection. Lone working is one of the factors the risk assessment must take into account, because it lengthens the time to detect an incident and delays first aid.

Detailed requirements are set out in the regulation on general occupational health and safety rules. For selected particularly dangerous jobs it provides that they be performed by a team, which in practice rules out working alone. For other workstations the decision is made by the employer on the basis of risk assessment, and the health and safety manager should be able to justify it to the inspector.

  • Art. 207 KP: employer responsibility for health and safety, also outside direct supervision.
  • Art. 212 KP: work organisation ensuring safe conditions and awareness of hazards.
  • Art. 226 KP: occupational risk assessment and informing workers about risk.
  • General health and safety regulation: team requirement for selected particularly dangerous jobs.

Example time budget until help arrives

Example time budget until help arrivesBar chart comparing the example time to detect an incident without and with technical protection01020304050minWithout technical protection (Incident detection): 45 min45 minWith motionless detection and SOS (Incident detection): 5 min5 minIncident detectionWithout technical protection (Help arrival): 12 min12 minWith motionless detection and SOS (Help arrival): 12 min12 minHelp arrival
  • Without technical protection
  • With motionless detection and SOS
Source: Example calculation: assumes a round without contact lasts up to 45 min, a motionlessness threshold of 5 min and 12 min to reach the casualty. Values are not product parameters.

When working alone is not acceptable

Working alone is not acceptable wherever a regulation or the risk assessment requires a second person for safety backup. Typical examples are entries into confined and enclosed spaces, work at height without the ability to self-rescue, live electrical work, work in atmospheres that may contain toxic or explosive gases, and work with hazardous substances where help must arrive within a few minutes.

The practical test is simple: if the consequences of an incident may be irreversible before help called after motionlessness is detected can arrive, the work should not be done alone. Technology such as motionless detection or an SOS button shortens detection time, but it does not replace a second person where time is counted in seconds.

  • Confined spaces, tanks, ducts, wells.
  • Work at height without the ability to lower oneself independently.
  • Live electrical work and work in medium-voltage switchgear.
  • Explosion hazard zones and toxic atmospheres where a gas detector and backup are required.
  • Work involving hazards where calling for help independently is impossible.

Employer duties step by step

Meeting the duties effectively takes four elements: an inventory of workstations, a risk assessment, means of communication and help, and documentation. Skipping any of them ends, in an audit or after an accident, with the question of how the employer knew the worker was safe.

1. Workstation inventory

A list of workstations and routes where a worker may be alone: rounds, duties, maintenance, internal transport. For each we determine the time spent without contact and the places without communication coverage.

2. Risk assessment and decision

The risk assessment ends with one of three decisions: team work, lone work with technical and organisational protection, or moving the task to a time when backup can be provided.

3. Contact and calling for help

The worker must have a way to call for help without performing complicated actions. In the InnerWeb solution the SOS alarm is triggered with a watch button gesture (triple click or long press) with a three-second countdown that allows a mistaken alarm to be cancelled. When the worker can no longer call for help alone, the system detects motionlessness: the device analyses its sensors while the server independently measures time, and only agreement between the two triggers the full alarm.

4. Help and documentation

Someone must know where the worker is and have a procedure for reaching them. Documentation covers the risk assessment decision, the contact instruction, training results and a record of events: notifications, calls and confirmations.

How to document contact and help

Audit evidence is a record showing that contact actually worked, not only that a procedure exists. The system should log motionlessness and SOS alarms, notifications sent to responsible persons and their confirmations. InnerWeb also stores the event log of the worn device, meaning the sensor decisions and the alarm cycle, which after an event makes it possible to reconstruct what the device did.

Response time thresholds, the time allowed for worker confirmation and sensor sensitivity are configured in the panel, so the risk assessment document can state concrete settings for a given workstation. This supports meeting the requirement to document preventive measures and does not replace the employer's decision. The values in the table below illustrate the structure and are not fixed product parameters.

  • Workstation card: description of lone work, time without contact, risk assessment decision.
  • Contact instruction: who reacts to a lack of response and within what time.
  • Register of alarms and notifications with time and recipient.
  • Record of worker training on the device and the SOS procedure.
  • Report from a test alarm carried out periodically.

The most common employer mistakes

The first mistake is assuming that a mobile phone solves the problem. A phone requires the injured person to be able to use it, and in explosion hazard zones an ordinary phone is often prohibited. The second mistake is a procedure without a recipient: the alarm goes to a mailbox nobody reads at night. The third is the absence of test alarms, so nobody knows whether the chain really works.

The fourth mistake concerns coverage. A system that does not work in a basement, in a hall with thick walls or on a remote yard gives a false sense of safety. An alarm is not promised outside network coverage without a coverage solution, which is why a coverage map is part of the deployment and not an add-on.

Video

Frequently asked questions

Is lone working forbidden?

There is no general ban. The employer decides on the basis of the risk assessment under Article 226 of the Labour Code, and for selected particularly dangerous jobs the regulations require them to be performed by a team.

Is it enough that the worker has a mobile phone?

Usually not. A phone works only if the injured person is able to use it, and in explosion hazard zones a device approved for the zone is required. Motionless detection closes this gap.

What should be documented after an event or a test?

The alarm time, notification recipients, confirmations, the last known location and the actions taken by the duty person. The InnerWeb system records alarms, notifications, SMS and calls, which provides audit evidence.

Does the system call the ambulance or emergency services?

No. The system notifies the people named in the configuration, for example the dispatcher and the duty person, and can trigger a phone call through an external webhook. The decision to call emergency services is made by a human.

Sources