Starting situation
A petrochemical plant inside a refinery, an essential entity under NIS2, runs continuous operations on a sprawling complex. The site covers ca. 531 ha, and the outline of the complex in this example measures ca. 5.4 by 3.2 km. An operator goes out on rounds of pumps, heat exchangers and pipelines, often at night and alone.
The plant works with Ex phones (Android, Bluetooth 4.2) and Bluetooth gas detectors. It does not want to replace its workers' equipment, and the safety department asks the questions any CISO or OHS manager would ask: how to establish a person's position in an Ex zone when GPS does not work, what certificates the beacons hold, and whether the list of people on site is good enough for an evacuation.
The problem: nobody knows where the worker is
GPS coverage in a process unit is limited by steel structures, tanks and dense installations. The control room operator sees process parameters but cannot see a person. If a worker collapses behind a column, the dispatcher learns of it only when the next radio call goes unanswered, and by then nobody knows where to look.
A third dimension is evacuation. A list of people in the zone based on passes tells you who entered the site, but not which part of the unit they are in at a given moment. For the rescue commander that is the difference between searching the whole complex and sending a team to a specific place.
Position error in the simulation with beacons every 100 m
The solution: BLE beacons and an Ex phone
The system consists of BLE beacons (industrial radio beacons) in an ATEX version, placed along site roads every ca. 100 m, and the worker's Ex phone, which acts as receiver and relay. The InnerWeb industrial radio beacon has an industrial design registration, a CE declaration and an ATEX version for zones 2 and 22, while certification for zones 1 and 21 is commissioned for the needs of a given installation, with no promised lead time.
The phone picks up signals from several beacons at once together with the strength of each, and sends them over the cellular network or Wi-Fi every few seconds. The position is averaged on the map from the signals of many beacons rather than determined by the strongest-signal method. Location runs on BLE beacons, without GPS.
- Site roads: beacons every ca. 100 m.
- Building interiors: 1 beacon per 100–200 m2, which allows the floor to be recognised.
- Receiver: the worker's Ex phone, with no equipment replacement.
- Mounting on poles and structures with straps or adhesive, with no cables and no mains power.
- Beacons run on industrial batteries for several years, in a temperature range from -40 to 60 degrees Celsius.
Alarms: SOS, no movement and fall
The mobile app detects SOS, lack of movement and falls, and the alarm reaches the dispatcher together with the last known location. Detection has two levels: the device analyses motion sensors, the server independently counts time, and only agreement between the two triggers the full alarm. This limits false alarms, which in a process unit lead to dispatcher desensitisation.
Once the threshold is exceeded, the system notifies the responsible people, creates an emergency permit from a template and marks the place on the map. When the worker moves again, the emergency permit closes itself. An SOS alarm works differently: only a person closes it, and the worker's movement does not clear it. We do not promise an alarm outside network coverage without a coverage solution, which is why the rollout plan includes a coverage survey along the rounds routes.
Result and figures from the simulation
A simulation on the real geometry of the site with beacons every 100 m gave an average position error of ca. 15 m and a maximum of ca. 39 m. This is an estimate from a concept document, not a guarantee for every installation, but it is enough to point a rescue team to a stretch of road or a part of the unit rather than the whole complex. Inside buildings, where beacons are denser, the floor is recognised.
The evacuation list shows who is in the zone, refreshed every dozen or so seconds, with a printout for the incident commander. The evacuation route and assembly point are not functions of the system: it shows the list of people and their last position. Integrating gas readings from detectors depends on the detector manufacturer's protocol and is a topic for discussion, not a standard feature.
Conclusions for other plants
First, keep the Ex phone and the detector and add beacons and an app, instead of replacing workers' equipment. Second, show the concept on the real geometry of the site: outline, roads, buildings, not on a generic diagram. Third, separate honestly what the system does today from what depends on a third party's protocol or on certification for zones 1 and 21.
The system is an independent overlay that complements and tightens existing permit, qualification and training systems. It supports meeting the risk assessment requirement under Article 226 of the Polish Labour Code for lone workers and provides audit evidence: a record of alarms and of the position at the time of the event. Operation of the app on a specific Ex phone model requires confirmation on the plant's own device.
Video
Frequently asked questions
Do we need to replace Ex phones and gas detectors?
No. The worker's Ex phone is the receiver and relay for beacon signals. Operation of the app on a specific model does need confirmation on the plant's own device.
Is the position taken from the strongest beacon?
No. The position is averaged on the map from the signals of many beacons, which gives a more stable result than indicating the nearest point.
Which zones are the beacons approved for?
The radio beacon has an ATEX version for zones 2 and 22. For zones 1 and 21, certification is commissioned for the client's installation, with no promised lead time.
Does the system show an evacuation route?
No. It shows the list of people on site and their last known position, which supports the commander in making decisions.
Sources
Let us talk about protecting lone workers
We will show on your site plan how detection of no movement, SOS and location close the gap in lone working. Book a conversation with the InnerWeb team.
Let's talk