Work area outline and hazardous zone: implementation notes

On the plant map, a work permit covering several locations is drawn as one work area outline. A health and safety manager may easily read it as a hazardous zone from the procedure, and these are two different things: the outline is a visualization, not a zone in the meaning of regulations. Below are notes on how to set this up and describe it in the procedure.

30 chars
limit on the length of a location name in the system
Source: spec sheet
2.5D
isometric view of the plant map
Source: spec sheet

What the work area outline is

The online plant map is isometric (2.5D view): it shows building volumes, vehicles, employees and work sites, refreshed cyclically. When a permit covers several locations, the system draws them as one work area outline, so that a person looking at the map immediately sees the reach of the work.

This is a visualization. The outline shows where work covered by the permit takes place on the map. It does not say that there is a hazard around, that entry is prohibited or that a zone has been designated in accordance with regulations.

What must not be assumed

In health and safety procedures the word zone has concrete consequences: access restrictions, required protective measures, an obligation to mark it. If the procedure refers to the outline on the map, someone may conclude that everything outside the outline is safe.

Four false assumptions

The following assumptions recur during implementations and should be excluded from the wording of the procedure.

  • the outline covers the whole hazard zone from the risk assessment
  • a place outside the outline is free of hazards
  • the outline changes permissions or opens and closes access
  • a drawn outline fulfils the obligation to designate a zone

Example configuration steps: working time

Example configuration steps: working timeBar chart of example step times: 6, 2, 3 and 4 hours.0246hStructure in the editor: 6 h6 hStructure in theeditorLocation names: 2 h2 hLocation namesLinking with templates: 3 h3 hLinking withtemplatesAcceptance and training: 4 h4 hAcceptance andtraining
Source: Illustrative calculation for one hall on assumed values, to be measured in the pilot

How to describe it in the procedure

The procedure should separate two concepts: the hazardous zone designated by the responsible person, and the work area outline as a visualization of the permit on the map. A model sentence: the work area outline on the map serves orientation and does not replace the designation and marking of a hazardous zone.

The same wording should also be added to the instructions for the dispatcher and to the training of people who issue permits, so that in a radio conversation nobody uses the word zone for the outline from the map.

Order of implementation

Configuration runs in four steps. First, the plant describes its structure: buildings, floors and equipment are drawn in the map editor, and moving a saved building outline does not lose its contents. Then it names the locations, keeping the 30-character limit in mind. Next it links the locations with permit templates. Finally, it checks how the outline looks for a permit with several locations.

A hall in the system can have georeferencing: an anchor point, rotation, scale and an orthophoto of the site, with buildings as subordinate objects. This helps to match the map to the real layout, but it does not change the meaning of the outline.

Multi-storey buildings

A double-click on a building enters the interior, and the floor selector (P, 1, 2 and up) shows the floors. The outline of work on one floor says nothing about the neighbouring one, so the procedure for multi-storey buildings should require the floor to be indicated explicitly.

Acceptance and training

At acceptance, check on a test permit whether the outline matches the locations entered in the permit and whether the person authorized to issue permits understands that it is a visualization. The training for dispatchers and coordinators should include one comparison slide: the outline on the map versus a hazardous zone.

InnerWeb provides audit evidence in the form of the permit record and the locations. The decision to designate a zone is always taken by the plant, on the basis of the risk assessment.

After implementation, it is worth reviewing once a quarter several completed permits and comparing the outline with the actual reach of the work. Discrepancies show whether locations are named and linked to templates in line with practice, and whether employees are not carrying the outline into their work conversations. Conclusions from the review go into updates of the procedure and into the next round of training.

Checklist

Video

Frequently asked questions

Can the work area outline be treated as a hazardous zone?

No. It is a visualization of a permit on the map. The hazardous zone is designated by the person responsible in the plant, based on the risk assessment.

Does the outline change employees' permissions?

No. The outline shows the reach of the work, and permissions result from the permit, qualifications and the plant's settings.

Why describe this in the procedure?

Because the word zone has concrete effects in health and safety. Separating the concepts prevents the assumption that a place outside the outline is free of hazards.