InnerWeb
Skip to main content

No signal in the plant: how to have the QR code on the phone without a network

In a steel hall, a cold store or an underground warehouse the phone loses signal, and with it the ability to open the message with the code. The IT or OT department must therefore make sure the code is on the screen before the person enters an area without a network. Below are the implementation notes step by step.

233 × 233 px
size of the code image in the e-mail
Source: InnerWeb function documentation

Where the signal is really missing

Steel halls, cold stores, airlocks and underground warehouses dampen mobile and Wi-Fi signals. The phone then shows its last state, and opening a new message or page does not work. A scan at the gate, however, is an operation of the scanner that reads the image from the screen, so it does not require a network on the phone's side.

The problem is therefore not the scan itself, but the availability of the code on the screen at the moment of the scan. If the code is in a message that the phone must download, the lack of signal prevents it from being displayed. That is why it must be ensured that the code is downloaded before entry.

Code in the body of the message, not behind a link

The message with the code contains the code image of 233 x 233 pixels and a link to the plant. The image is part of the e-mail message, so once the message has been opened within signal range it stays in the mail app's memory and works without a network. With an SMS containing a link it is the opposite: the link leads to a page that requires a connection.

That is why for people entering areas without a network, choose e-mail as the channel, and treat SMS as a backup. Also ask them to open the message and make sure the image loads before entering the area without signal.

Availability of the code without a network by preparation method (example rating, 0-100)

Availability of the code without a network by preparation method (example rating, 0-100)A paper label and an e-mail opened before entry give higher availability than an SMS with a link.020406080100ptsSMS with a linkSMS with a link: 20 pts20E-mail opened before entryE-mail opened before entry: 85 pts85Paper labelPaper label: 100 pts100
Source: Example calculation: qualitative rating, to be verified in the pilot

Preparing the phone before entry

The simplest practice is a screenshot of the code saved in the user's own phone gallery, made just before entry. A warning here: a screenshot can be passed to another person, so in sensitive zones the identity confirmation at the scan should remain, and the plant should describe this practice in the instructions.

An alternative is a label issued at reception for people working in areas without a network. The default label size is 86 x 54 mm, the code is not printed smaller than 13 mm, and HID, USB-COM scanners and the panel camera read it without a network on the phone's side.

  • E-mail as the channel for people entering areas without a network.
  • Opening the message within signal range, before entering the hall or cold store.
  • Brightening the screen and turning off battery saver mode at the scan.
  • Label 86 x 54 mm as a backup.
  • Instructions for people who save a screenshot.

On the IT and OT side: what to check

An HID or USB-COM scanner in a zone without a network must have a connection to the security panel, because recognition of the code happens on the server side, with one rule shared with the gate. The browser does not parse the code, so a lack of network between the scan point and the server stops the entry decision.

That is why the OT department should confirm that the scan points have an independent link: cabled or wired Wi-Fi, not the mobile signal of the staff phones. This is independent of the worker's phone and it is worth describing it in the plant's network documentation. When the link disappears, security moves to the emergency path from the instructions.

Testing in the pilot

Before going live, agree with IT a test in the places where the signal is weakest: near the cold store, in the airlock, in the steel hall. Measure the scan time with a brightened screen and with the screen in battery saver mode. The data for the calculation should be collected by the plant, not by the vendor.

Turn the test results into a note in the instructions: which zones require a backup label and which may use the code on the phone. It is a simple table and one page for the gatekeepers.

Video

Frequently asked questions

Does a scan at the gate require signal on the phone?

No. The scanner reads the image from the screen. Only the link between the scan point and the server is needed, because the code is recognised on the server side.

Does a screenshot solve the problem?

Partly. It gives access without a network, but it can be passed on, so in sensitive zones identity confirmation remains.

What about people without a smartphone?

A label with the code issued at reception. The same code works on paper and on the phone.

Let us test the QR code in your difficult zones

We will plan with IT and OT a test near the cold store, the airlock and the steel hall. Let's schedule a short call.

Let's talk